My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-03-25 PC Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2025
>
12-03-25 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 4:28:30 PM
Creation date
11/26/2025 4:27:51 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 11 <br /> <br />not done, the City, at its sole discretion, may use the proceeds of the performance <br />guarantee to accomplish performance. <br />4. The Applicant shall be responsible for obtaining any other permits necessary from other <br />agencies, including, but not limited to, Minnesota Pollution Control Agency, Ramsey <br />County, Rice Creek Watershed District, and any other relevant parties prior to the start <br />of any site activities. <br />5. The Applicant must provide a copy of the Water Management Plan and Report and <br />verification of Rice Creek Watershed District staff approval to the city prior to the <br />approval of grading and erosion control permit. <br />6. The Applicant must obtain a Grading and Erosion Control permit from the City’s <br />Engineering Division prior to the commencement of any land disturbance activities. <br />7. The Applicant must obtain a Right of Way permit from the City’s Engineering Division <br />prior to any work impacting City property or to use the trail for access to the work area. <br />8. Heavy duty silt fence and adequate erosion control around the entire construction site <br />is required and must be maintained by the Applicant during construction to ensure that <br />sediment and stormwater do not leave the project site. <br />9. The Applicant is responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and <br />all stormwater runoff, sediments, and debris during all construction activities. <br />Temporary stormwater facilities must be installed to protect the quality aspect of the <br />proposed and existing stormwater facilities prior to and during construction activities. <br />Maintenance of any and all temporary stormwater facilities shall be the responsibility <br />of the Applicant. <br />10. The Applicant must continue to submit annual noise studies to the city. <br /> <br />2. Recommend Approval: Move to recommend approval of Planning Case 25-014 for a Site Plan <br />Review to allow a noise barrier wall at 4100 Hamline Avenue North, based on the findings of <br />fact and submitted plans in the December 3, 2025, report to the Planning Commission with <br />amendments: a specific reason should be included with all amendments. <br /> <br />3. Recommend Denial: Move to recommend denial of Planning Case 25-014 for a Site Plan <br />Review to allow a noise barrier wall at 4100 Hamline Avenue North, based on the findings of <br />fact and submitted plans in the December 3, 2025, based on the following findings of fact: the <br />Planning Commission should identify findings to deny should specifically reference the <br />reasons for denial and why those reasons cannot be mitigated. <br /> <br />4. Table: Move to table Planning Case 25-014 for a Site Plan Review to allow a noise barrier <br />wall at 4100 Hamline Avenue North for the following reasons: the Planning Commission <br />should identify a specific reason and/or information request should be included with a motion <br />to table. <br /> <br />Notice and Public Comments <br /> <br />Notice was published in the Pioneer Press on November 21, 2025. Notice was prepared by the <br />City and mailed to property owners within 500 feet of the Subject Properties. As of report drafting, <br />City staff had not received public comments related to this case. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.