Laserfiche WebLink
Boston Scientffic Public – Public Release Authorized <br /> <br />Tentatfve tfmeline for actfvitfes related to the noise barrier wall: <br />• Early September (COMPLETE) – soil testfng for insight into structural design of the barrier wall. <br />Brush clearing around x6 locatfons was completed with x2 significant trees removed. These x2 <br />trees are on a tree log for the project and will be included in the count for tree preservatfon <br />plan. <br />• October 2025 – Invasive species (buckthorn and cottonwood tree removal) maintenance. See <br />table item #5 above. Diseased, dead, and nuisance trees will be removed and do not count <br />toward calculatfon of significant tree inventory in accordance with Subd. 5 of the Arden Hills <br />Tree and Landscaping Preservatfon Code. Cottonwood trees that fall under the Significant Tree <br />definitfon will be documented and placed in the tree preservatfon pl ans as required. BSC will <br />be within guidance for tree removal allowance requirements. <br />• December 2025 – Tentatfve Planning Commission Meetfng <br />• January 2026 – Tentatfve City Council Meetfng <br />• March/April 2026 – Tentatfve constructfon commences <br />• August/September 2026 – Tentatfve constructfon ends <br />Sincerely, <br /> <br />Boston Scientffic Corporatfon <br />Attn: Savannah Doerr <br />4100 Hamline Ave N <br />Arden Hills, MN 55112 <br /> <br /> <br /> <br />