Laserfiche WebLink
Feasibility Study <br />Option Scope Schedule Budget Considerations <br />Basic Study Focus on in-place <br />building modifications <br />only: <br />•Screening <br />•Façade upgrades <br />•Size reduction <br />•Energy Capture <br />3-6 months ~$50,000 •Limited alternatives/conclusions <br />•Requires multi-agency <br />coordination <br />•Funding source not identified <br />Comprehensive <br />Study <br />Analysis of wider range <br />of options: <br />•In-place modifications <br />•Alternative locations <br />(on/off-site) <br />6-9+ months ~$250,000 •Comprehensive study analyzing <br />feasibility of all identified <br />options <br />•Would require multi-agency <br />coordination and unknown <br />process to determine true <br />feasibility of options <br />•Funding source not identified <br />•High risk of project delays