Laserfiche WebLink
<br />Joint Development Authority <br />TCAAP Redevelopment Project <br />In 2015, the Energy Integration and Resiliency Framework (EIRF) acknowledged Building 116 as a <br />component of the existing infrastructure and proposed it as a potential asset to the future development <br />of the site. Because the pumping of water through the TGRS produces heat as a byproduct, it presents a <br />potential renewable energy source for a future district energy system. JDA staff explored this concept <br />with the Army beginning in 2016, which included favorable conversations and preliminary design <br />coordination with Army staff and consultants, however conversations paused when project progress <br />stalled around 2018. The 2024 Clean Energy Analysis Report estimated that utilizing the energy from the <br />TGRS could meet 30% of heating and 13% of cooling demands for Rice Creek Commons, while saving an <br />estimated $6.6 million in capital costs by reducing the number of required geothermal wells. <br /> <br />The 2016 solicitation for development partners outlined several existing conditions and said that <br />redevelopment of the site would require “awareness and expertise” in addressing these constraints. In <br />this section, Building 116 was described as a “treatment facility” and was expected to be screened and <br />potentially used as a clean energy source (page 11): <br />“On-site treatment of contaminated groundwater will continue for several decades. The U.S. <br />Army controls this groundwater treatment system (known as the TGRS). The County is rerouting <br />and upgrading some of the TGRS piping. The treatment facility will need to remain in place but <br />can be screened and integrated into a public space. Pump house stations along the perimeter of <br />the site will also need to remain in place. The treated water from the TGRS system is an <br />opportunity for energy resiliency as a heating/cooling source as described in the Energy <br />Integration Resiliency Framework document on the RCC website.” <br />The solicitation document also included a statement that responses “constitute agreement by the <br />responder that it has read and will comply with all provisions in this solicitation document.” In a <br />previous term sheet, the JDA did not plan to study the feasibility of moving Building 116 itself but <br />instead agreed to support the developer in leading this exploration, if desired. <br /> <br />Building 116 Concerns <br />Over the past few years, various concerns about Building 116 have been raised. Understanding the basis <br />of these concerns can inform discussions about the future of the building. <br /> <br />Location, Space, and Aesthetics <br />One expressed concern is that the building is an “eyesore.” This comment is difficult to address as it is a <br />subjective assessment, however, there are some facts about the building itself that can inform this <br />concern broadly. (Photos are available in the attached presentation) <br /> <br />The building is located in an area zoned for open space near the eastern property line, adjacent to a <br />portion of the district stormwater system (NRC). This appears to have been an intentional choice when <br />the zoning for the site was established, so that the building is not mixed in with residential or <br />commercial areas. The building is about 15,000 square feet out of the 5.9-acre open space parcel where <br />it sits on the zoning map (less than 6% of the zoned area). The building has not undergone major <br />updates since it was constructed 1942. The facility is currently composed of a tan brick façade with glass <br />brick windows, adjacent air stripping towers, and a surrounding fence. The building envelope may be