My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
12-08-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 12:17:15 PM
Creation date
12/5/2025 9:41:08 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VII. Public Works/Engineering <br />Outstanding Balance Escrow <br />Balance owed on existing permits <br />110% of the amount owing <br />from the same permittee <br />Annual Utility <br />Annual Registration Fee <br />$80.00 <br />Owner/Contractor Registration <br />Administrative Fee <br />$35.00 <br />Right -of -Way Permit — <br />Excavation Permit Base Fee <br />$125.00 + $.55/LF of Trench or <br />Excavation <br />Directional Bore <br />Escrow <br />Determined by Public Works plus <br />Outstanding Balance Escrow if <br />applicable <br />Right -of -Way Permit — <br />Administrative Fee <br />$35.00 <br />Obstruction <br />Obstruction Permit Base Fee <br />$50.00 + $0.05/LF + $50.00/EA (per <br />pole, cabinet, tree, etc. <br />Escrow <br />Determined by Public Works plus <br />Outstanding Balance Escrow if <br />applicable <br />Right -of -Way Permit - Small <br />Administrative Fee <br />$35.00 <br />Cell Wireless Facilities/DAS <br />HUB (Up to 15 Locations per <br />Small Cell Wireless Facilities/DAS <br />$100.00 per site; $500.00 minimum <br />application) <br />HUB Permit Fee <br />Rent & Maintenance Fee <br />Rent: $180.00/year/utility company; <br />lus Maintenance: $27/ ear/location <br />Escrow <br />Determined by Public Works plus <br />Outstanding Balance Escrow if <br />applicable <br />Right -of -Way Permit — Permit <br />Permittee request to extend dates <br />$50.00 <br />Extension <br />specified within the permit <br />Right -of -Way Permit — Delay <br />In accordance with Minnesota Rule <br />$25.00 + Permit Extension Fee <br />Penalty <br />7819.1000 Subpart 3 <br />Hydrant Meter Rental (for City <br />Permit Fee, Monthly Rental and <br />$200.00 + State Surcharge of $1.00 + <br />elated projects, only deposit <br />Water Usage <br />Rental of $50.00/mo, + applicable <br />amount is required) <br />standard water usage rate charged for <br />consumption <br />Deposit <br />$2,500.00 <br />Grading & Erosion Control <br />Residential (grading work >2500 <br />Resident Self -performed $60.00 <br />Permit (required when land <br />SF to 5000 SF or >50 CY or within <br />Residential Remodel $200.00 <br />disturbance is >2500 SF or >50 <br />1000' of shoreland area) <br />Residential New Build $300.00 <br />CY or within 1000' of shoreland <br />Non -Residential <br />0 to 1 acre $350 <br />area, as outlined in Chapter 15 <br />>1 acre to 5 acres $550 <br />of City Ordinance) <br />>5 acres to 10 acres $1100 <br />> 10 acres to 20 acres $1650 <br />>20 acres to 40 acres $2,200 <br />>40 acres $2750 plus $500 for each <br />10 acres thereafter <br />Escrow <br />Determined by Public Works plus <br />Outstanding Balance Escrow if <br />applicable <br />City Performed Restoration Fee <br />City restoration or corrective work <br />Actual cost of materials and labor <br />of permittee's responsibility <br />plus 10% Administration fee <br />Page 7 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.