MIJ <br />TKDA <br />Attachment A <br />Arden Hills <br />South Water Tower <br />Project No.17993.001 <br />Compensating Change Order No.1 <br />Issue Date: November 5, 2025 <br />Contact Changes per Change Order: <br />Add new bid items 11-14 in the amount of $90,675.00 for additional work as listed in the attached itemization list <br />and as described below. This is also the compensating change order to balance the final quantities used for the <br />project to be the final contract amount that resulted in a deduction of $35,000.00 to the contract. The Final <br />Change Order No. 1 amount will add $55,675.00 to the Project. <br />• Item 11 was not included in the original bid and the pit piping was in poor condition; the 1" coupling was <br />requested by City staff for a fiber connection into the water tower <br />• Item 12 — The specification for the bid included 20% of the entire ceiling rafters/overlaps/weld seams to be <br />rehabilitated, but it was found to be 35% when the water tower was drained. The inspection report was a few <br />years old and more areas were found than estimated. These were critical to rehabilitate now. <br />• Item 13 — The specification for the bid included 200 wet interior spots based on the inspection report. Not all <br />areas of the tank were able to be inspected previously and there were 55 additional spot areas that needed to <br />be rehabilitated. These areas were also critical to rehabilitate now when the water tower was out of service. <br />• Item 14 — The Mud valve at the bottom of the bowl of the water tower was not scheduled to be replaced, but <br />upon completion of the painting, it was found to be leaking and needed to be replaced. <br />Original Project Sum $ $347,000.00 <br />Net Change from previously approved Cos $ <br />Project Sum prior to CO No. 1 $ $347,000.00 <br />CO No. 1 Increases Project Sum in the amount of $ 55,675.00 <br />New Project Sum upon approval of CO No. 1 $ 402,675.00 <br />The Contract Time will not be changed. <br />Attachments: <br />Itemization List <br />Approved by: <br />TKDA <br />CONSULTANT (FIRM) <br />4*R.&% <br />SIGNATURE <br />Matthew R. Ellingson <br />Project Manager <br />PRINTED SIGNER NAME & TITLE <br />November 5, 2025 <br />DATE <br />BRZ Coatinas Inc. <br />CONTRACTOR (FIRM) <br />City of Arden Hills <br />OWNER (CITY) <br />4-a(.c.G qC�Ae G <br />SIGNATUM SIGNATURE <br />Isai Garcia / Project manager <br />PRINTED SIGNER NAME & TITLE <br />11 / 6 / 2025 <br />DATE <br />DATE <br />3311 East Old Shakopee Road, Suite 300, Bloomington, MN 55425 1 tkda.com 1651.292.4400 <br />