My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
12-08-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 12:17:15 PM
Creation date
12/5/2025 9:41:08 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hllls, MN <br />Project # 25-Eqp-001 <br />Project Name Replace 1993 Case 621 Loader #103 <br />Total Project Cost $300,000 <br />Department <br />Equipment <br />Type Equipment <br />Category <br />Vehicles <br />Priority n/a <br />Status <br />Active <br />Useful Life 20 years <br />TCAAP <br />No <br />Description <br />Vehicle #103 - 1993 Case 621 Loader & Plow Total Hours 3,683 <br />Hour gauge: 2018 - 3,073; 2019 - 3,344; 2020 - Not available; 2021 - 3,438; 2022 - 3,50;1 2023 - Not available; <br />2024 - 3,630; 2025 - TBD <br />New Loader estimate - $225,000 <br />Frontwing/Plow - $75,000 <br />Justification <br />Vehicle will be 33 years old. <br />This piece of equipment is used year round for loading trucks, stock pile management, and is a backup to our snow plow fleet. Also, during emergencies, it is used for <br />clearing trees to open roadways and access utilities. Due to its age, this loader is showing deterioration and some significant corrosion. Replacement parts are hard to find <br />and equipment is at end of life for wiring, hoses, and hydraulic seals. Downtime is increasing with constantly repairing fluid leaks from old lines and broken fittings. Staff <br />recommends replacement in 2026. <br />Fleet CEP Points Replacement Guidelines Rating is 63.5 (Needs immediate consideration) <br />Parts and labor costs: <br />Total PM Repairs <br />2019 - $1,652 <br />2020 - $2,361 <br />2021- $5,150; $1,070; $4,080 <br />2022 - $2,220; $2,220; $0 <br />2023 - $0 <br />2024 - $3,766; $0 $3,766 (2 weeks of total downtime) <br />2025 (June) - TBD $325 $2,120 (2 weeks of total downtime) <br />Duties for Loader: Snow plowing, Wing back banks, Bucket snow in cul-da-sacs, PW shop materials handling, Storm damage management, Stuck equipment recovery. <br />Expenditures <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Equip/Vehicles/Furnishings <br />0 <br />300,000 <br />0 <br />0 <br />0 <br />300,000 <br />Funding Sources <br />Total 0 <br />2026 <br />300,000 <br />2027 <br />0 <br />2028 <br />0 <br />2029 <br />0 <br />2030 <br />300,000 <br />Total <br />Equipment/Building Replacement Fund <br />0 <br />275,000 <br />0 <br />0 <br />0 <br />275,000 <br />Trade -In Value <br />0 <br />25,000 <br />0 <br />0 <br />0 <br />25,000 <br />Produced Using Plan -It CIP Software <br />Total 0 <br />7 <br />300,000 <br />0 <br />0 <br />0 <br />300,000 <br />Page 2 / 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.