Laserfiche WebLink
2026 thru 2030 <br />Capital Improvement Plan <br />Arden Hllls, MN <br />Project # <br />26-Eqp-004 <br />Project Name <br />Pipeline Inspection Push Camera System <br />Total Project Cost <br />$12,000 Department Equipment <br />Type <br />Equipment Category Equipment: Public Works <br />Priority <br />3 Important Status Active <br />Useful Life <br />15 years <br />Description <br />Push camera for pipeline <br />maintenance and inspection within the city's surface water system and sanitary sewer. This camera is able to inspect pipes smaller than 8 inches in <br />diameter. The current camera <br />inspection equipment Public Work operates will inspect pipes 8 inches in diameter and larger. <br />Justification <br />The push camera system can be utilized for pipeline inspection and for utility locating and line tracing. It's another tool Public Work can utilize for emergencies and <br />maintenance functions. <br />Expenditures <br />2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />EquipNehicles/Furnishings <br />12,000 <br />0 <br />0 <br />0 <br />0 <br />12,000 <br />Total 12,000 <br />0 <br />0 <br />0 <br />0 <br />12,000 <br />Funding Sources 2026 <br />2027 <br />2028 <br />2029 <br />2030 <br />Total <br />Equipment/Building Replacement Fund 12,000 0 0 0 0 12,000 <br />Total 12,000 0 0 0 0 12,000 <br />11 <br />Produced Using Plan -It CIP Software Page 6 / 75 <br />