My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-25-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
12-08-25-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 12:17:15 PM
Creation date
12/5/2025 9:41:08 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-o,it.,l <br />e2 000 deposit, <br />monthly o <br />$ l 80 nn State s,,,.,.h " l nn <br />-g <br />Pitts . pl-i-e.,l-lo <br />Water-Meter,eer-arges— <br />Customer- Requested Water- Mete <br />Roo inel„des ro .,1 f <br />meter-, beneh test .,t <br />to <br />mote. Size C <br />Basel <br />n f aet <br />Publie W,,,.vs for- Quote <br />r-etuming meter- r-esidenee�, <br />Roo <br />be if the- <br />will net applied <br />meter- found t be <br />inaeetir-ate to a degree <br />tiffee (34 <br />exeeeding p nt <br />f the 6,0,E b, <br />f-,,,Y, the <br />result <br />test <br />Water Meter/Spacer Charges <br />Water Meter/Spacer Charges <br />3/4" Meter Model 25 <br />Standard Meter <br />$480.00$495.00 <br />Water- Meter4Spaeer- Charges <br />C r4aet Publie W,),.vs for- <br />3TxMeter- NloR 3 <br />Quote <br />Water Meter/Spacer Charges <br />1" Meter Model 70 <br />$590.00$720.00 <br />Contact Public Works for Quote <br />Water Meter/Spacer Charges <br />Greater than 1" <br />Customer Requested Water Meter <br />Fee includes removal of meter, <br />5/8" to 1" water meter: $250.00 <br />Accuracy Test <br />installation and administration of <br />Greater than 1" meter: $500 <br />temporary meter, testing services, <br />and returning meter to residence; <br />$855.00 per acre or portion <br />thereof <br />Fee will be reimbursed if the meter <br />is found to be inaccurate outside of <br />WWA allowed tolerances <br />Water Connection Fee — <br />Connection fee for previously un- <br />served or expanded lots <br />Water Availability Fee — <br />New or Additional Units <br />The units are based on the <br />Metropolitan Council's <br />formula for calculating new <br />sewer availability charge <br />SAC units <br />$ 1,375.00 per unit <br />Rice Creek Commons <br />Water Availability Fee <br />This fee applies to the Rice <br />$5,360.00 per unit <br />Creek Commons <br />development only. The units <br />are based on the Metropolitan <br />Council's formula for <br />calculating new sewer <br />availabili charge SAC units <br />Sewer Connection Fee — <br />Connection fee for previously un- <br />served or expanded lots <br />$840.00 per acre or portion <br />thereof <br />Sewer Availability Fee — <br />New or Additional Units <br />The units are based on the <br />Metropolitan Council's <br />formula -for calculating new <br />sewer availability charge <br />SAC units <br />$ 825.00 per unit <br />Page 9 of X <br />
The URL can be used to link to this page
Your browser does not support the video tag.