My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-25-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2025
>
12-08-25-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 10:16:19 AM
Creation date
12/5/2025 10:07:41 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5 LF RECONSTRUCT SANITARY MANHOLE % f <br />1 EA ADl UST CURB STOP BOX L.I - K O <br />r EXPLORATORY EXCAVATION TO LOCATE <br />#YZ (COORDINATE W/PW STAFF) 1 EA STOP 1241 KAR LA <br />ADJUST CURB STOP BOX J <br />I <br />� lEA ADJUST CURB STOP BOX/ 6 <br />Y <br />w 2 r <br />1 EAADJUST CURB STOP BOXEXPLO\ 'e <br />-� <br />#' CURB STOP(COORDNATIEE W/PW STAFF) _ Q 1EPCUPB <br />- 1 EA ADJUST CURB STOP BOX Y <br />9 KARTH LAKE OR <br />KgRTy —--- — -- ---- <br />L Oq pF <br />CI PP SHORT LINER(SAN) <br />REVIEW TELEVISING ROOTS oW `y TzzBkIy�� 11 EAEA� <br />Nu6w (ROOTS) <br />CONSTRI- ION LIMITS(TYP)ADIUST CURBSTOP BORN Y 2EA C"GV&BOX <br />DIP WM <br />f9 1 EA ALL U5T CURB STOP BOX qRr SLEEVE <br />ONNECT TO EXISTING WM <br />p SOLE EA 6" & BON LIMITS (TVP.) <br />yF 1LF RECONSTRUCT SANITARY MANHOLE <br />F 1LF RECONSTRUCT SANITARY MANHOLE LIT <br />2EA 6"GV&BOX <br />1 EA HYDRANT <br />1 EA ADJUST CURB STOP BOX <br />1EA ADJUST CURB STOP BOX - <br />1 EA ADJUST CURB STOP BOX Q. 1 EA 6" X 6' TEE <br />1 EA 6" SLEEVE <br />1 EA 6" GV & BOX _ a ¢� <br />9 26 IT6"DIP WM <br />L <br />u 1'DP WM - ` - 2'B� 2 <br />16F 6 <br />EACONNECFTO EXISTING WM <br />♦ 1 EACONNECI-TO EXISTING WM NOTES: ay <br />1. RECONNECT WATER SERVICE (TYP.) IS PAID AS 1 EA 1" CORPORATION STOP. ALL <br />MATERIALSANDI%BORREQUIRED TO RECONNECT THE EXISTING SERVICE PIPE Q" <br />TOTHE NEW CORPORATION STOP AT THE NEW WATERMAIN SHALL BE ;KARTH LAKE DR <br />CONSIDERED INCIDENTAL TO THE ASSOCIATED BID ITEM. <br />2. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATIONS OF ALL SANITARY I. <br />SERVICES AND WATER SERVICES. SERVICE LOCATIONS ARE DEPICTED BASED ON j ••, <br />THE BEST AVAILABLE INFORMATION BUT DEVIATIONS SHOULD BEANTICIPATED. — 7 �o <br />1RECONSTRUCT DRAINAGE STRUCTURE (SANITARY) SHALL CONSIST OF III J i186 <br />REMOVING THE EXISTING CONE ON THE MANHOLE AND INSERTING A48" 1133 PLEAS <br />BARRELSECTION MEETING THE HEIGHT SHOWN. •I I r� <br />r r r <br />s Z � <br />Y Y s Y <br />n <br />x <br />tt <br />Imp n �w Y <br />I• <br />I• <br />0 <br />____________ <br />m� <br />II _ <br />E <br />_ mrvcAE e <br />qgg� <br />x 1EA8"GV&BOX 6 LF 8" DIP W M <br />1EA 8"SLEEVE 1EA ADJUS CURB STOP BOXJ <br />2EACONNECTTOEXISTI NGWMi <br />DR "mil EAAD)UST CU RE STOP BOLR <br />X S` <br />4 G T n u LR rr o zs a ■ N z2z10 NICOLLETAVENUEw »uRAa CITY OF ARDEN HILLS, MINNESOTA <br />SU <br />_ Hoa DRAFT ` Pnoae Lsszleso-osaeR it BnP 2026 PMP STREET& UTILITY IMPROVEMENTS C4.04 <br />z w & M E N K Em F a° °ry °°°men<°m EN Hu I-s a� SANITARY &WATER PLAN <br />;= www.eonoa-mean.<om <br />KARTH LAKE DR <br />
The URL can be used to link to this page
Your browser does not support the video tag.