Laserfiche WebLink
Page 7 of 18 <br />VII.Public Works/Engineering <br /> Outstanding Balance Escrow Balance owed on existing permits <br />from the same permittee <br />110% of the amount owing <br /> Annual Utility <br />Owner/Contractor Registration <br />Annual Registration Fee $80.00 <br />Right-of-Way Permit – <br />Excavation <br />Administrative Fee $35.00 <br />Excavation Permit Base Fee $125.00 + $.55/LF of Trench or <br />Directional Bore <br />Escrow Determined by Public Works plus <br />Outstanding Balance Escrow if <br />applicable <br /> Right-of-Way Permit – <br />Obstruction <br />Administrative Fee $35.00 <br />Obstruction Permit Base Fee $50.00 + $0.05/LF + $50.00/EA (per <br />pole, cabinet, tree, etc.) <br />Escrow Determined by Public Works plus <br />Outstanding Balance Escrow if <br />applicable <br /> Right-of-Way Permit - Small <br />Cell Wireless Facilities/DAS <br />HUB (Up to 15 Locations per <br />application) <br />Administrative Fee $35.00 <br />Small Cell Wireless Facilities/DAS <br />HUB Permit Fee <br />$100.00 per site; $500.00 minimum <br />Rent & Maintenance Fee Rent: $180.00/year/utility company; <br />plus Maintenance: $27/year/location <br />Escrow Determined by Public Works plus <br />Outstanding Balance Escrow if <br />applicable <br /> Right-of-Way Permit – Permit <br />Extension <br />Permittee request to extend dates <br />specified within the permit <br />$50.00 <br /> Right-of-Way Permit – Delay <br />Penalty <br />In accordance with Minnesota Rule <br />7819.1000 Subpart 3 <br />$25.00 + Permit Extension Fee <br /> Hydrant Meter Rental (for City <br />related projects, only deposit <br />amount is required) <br />Permit Fee, Monthly Rental and <br />Water Usage <br />$200.00 + State Surcharge of $1.00 + <br />Rental of $50.00/mo, + applicable <br />standard water usage rate charged for <br />consumption <br />Deposit $2,500.00 <br /> Grading & Erosion Control <br />Permit (required when land <br />disturbance is >2500 SF or >50 <br />CY or within 1000' of shoreland <br />area, as outlined in Chapter 15 <br />of City Ordinance) <br />Residential (grading work >2500 <br />SF to 5000 SF or >50 CY or within <br />1000' of shoreland area) <br />Resident Self-performed $60.00 <br />Residential Remodel $200.00 <br />Residential New Build $300.00 <br />Non-Residential 0 to 1 acre $350 <br />>1 acre to 5 acres $550 <br />>5 acres to 10 acres $1100 <br />>10 acres to 20 acres $1650 <br />>20 acres to 40 acres $2,200 <br />>40 acres $2750 plus $500 for each <br />10 acres thereafter <br />Escrow Determined by Public Works plus <br />Outstanding Balance Escrow if <br />applicable <br /> City Performed Restoration Fee City restoration or corrective work <br />of permittee’s responsibility <br />Actual cost of materials and labor <br />plus 10% Administration fee