My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PC 04-06-2005
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Minutes
>
PC Minutes 2005
>
PC 04-06-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:19 PM
Creation date
11/10/2006 3:47:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ARDEN HILLS PLANNING COMMISSION - APRIL 6, 2005 4 <br /> . Chair Sand moved, seconded by Commissioner Thompson, to recommend tabling <br /> Planning Case No. 05-10, Ramsey County, I425 Paul Kirkwold Drive (Ramsey County <br /> Public Works and Sheriff Station), Sign Variance for additional factual and visual <br /> information to give staff sufficient time to make a recommendation. <br /> The motion carried unanimously (4-0). <br /> B. PLANNING CASE 05-11: ROLAND KARJALAHTI, 1137 EDGEW ATER <br /> A VENUE: FRONT/SIDE YARD CORNER SETBACK VARIANCES <br /> Mr. Hellegers stated applicant was requesting a 5-foot front yard setback variance and a <br /> 10-foot side yard comer setback variance for the construction of a new single family <br /> detached house on the applicant's property at I 137 Edgewater A venue in Arden Hills. <br /> Staff recommended approval of the variance subject to the following conditions: <br /> 1. The applicant shall file all necessary building pennits with the Building Official for <br /> approval prior to the issuance of a building permit. Building permit plans shall be <br /> submitted to the Building Official a minimum of two (2) weeks before the planned <br /> start of construction. <br /> 2. A drainage swale should be constructed along the western portion of the property to <br /> collect the drainage water flowing westward down the hill of the property and carry <br /> . the drainage toward the street. A revised grading the drainage plan showing this <br /> drainage swale shall require the approval of the Arden Hills City Engineer prior to the <br /> issuance of any building permits. <br /> 3. A revised grading and drainage plan showing the elevation of the first floor and <br /> basement and the surrounding property shall be submitted to the City and shall <br /> require approval by the City Engineer prior to the issuance of any building pennits. <br /> 4. The applicant shall be required to plat the property prior to the issuance of any <br /> building permits. <br /> Chair Sand asked if condition four should have the applicant replat the property. Mr. <br /> Hellegers replied that was correct. <br /> Commissioner Thompson asked for an explanation of the drainage swale. Mr. Hellegers <br /> summarized the drainage swale for the Commission. <br /> Commissioner Modesette asked if the curb cut and concrete driveway would remain. Mr. <br /> Hellegers replied there should only be one access and so it should be removed. <br /> Chair Sand asked if the retaining wall that was currently there was close to where the new <br /> retaining wall was being proposed. Mr. Hellegers replied it appeared to be close. <br /> . Commissioner Modesette stated she was not certain the engineering was complete <br /> enough to run the water to the street. Mr. HelIegers replied it might need a little more <br /> space and he would have the City Engineer review this before it would go forward. <br />
The URL can be used to link to this page
Your browser does not support the video tag.