My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 07-06-2005
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2005
>
PCP 07-06-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:24 PM
Creation date
11/10/2006 3:58:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> E'.NP~ <br />. Fol lowing construction or the proposed oroject the number of employees <br /> needed to operate th9 ~tire facility wi II be 175 over three shifts, <br /> but could include 227 J30ple per pay-period. This figure represents part~ <br /> time as wall as full-tj~e employaes--a total of 100 full-time equivalent <br /> employaas. <br /> These employees wil I ja divided into shifts epproximately as follows: <br /> 84 - 80rning shif~ <br /> 61 - afternoon shifT <br /> ~- night shift <br /> 175 <br />. <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.