My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 01-04-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 01-04-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:25 PM
Creation date
11/10/2006 4:00:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> (3) <br />. <br /> GcneratorConfil!1lration with Additional Eauinrnent Included: <br /> STANDBY POWERAPPUCAT1ON <br /> CATERPilLAR 3412DlT 500 EKWWIFAN, 120J208V, 1800 RPM, 60 HZ <br /> WOODWARD 2301 ELECTRONIC GOVERNOR <br /> ELECTRONIC MODULAR CONTROL PANEL (EMCP II), <br /> ALARM MODULE, NFPA 110, PANel MOUNTED RH <br /> CUSTOMER COMMUNICATIONS MODULE-CCM, SHIPS LOOSE <br /> REMOTE ANNUNCIATOR MODULE, SHIPS LOOSE <br /> GENERATOR, 593 FRAME PERMANENT MAGNET. (600 KW) <br /> SPACE HEATER KIT, DIGITAL VOLTAGE REGULATOR <br /> JACKETWATER COOLANT HEATER <br /> FUEL UNE HEATER (WATER SEPARATOR <br /> CATERPILLAR WEATHER PROTECTIVE NON SOUND ATTENUATED <br /> ENCLOSURE WITH CRITICAL GRADE SILENCER, INTEGRAL <br /> DUAL WALL, UL 142. FUEL TANK BASE-SOD GALLON <br /> STARTING MOTORS - HEAVY DUTY <br /> BATTERIES. CABLES, BATTERY CHARGER .10 AMP DUAL RATE <br /> BOTTOM CABLE ENTRY CIRCUIT BREAKE~, 1800 AMP 3-POLE, <br /> 208 VOLTS, GENERATOR MOUNTED RH <br /> CATERPILLAR FACTORY TEST REPORT <br /> SUBMITTAlS, 0 & M'S <br /> ShOD Witness Test; <br />. START UP AND WITNESS LOAD TEST (4) HOURS AT VARIED lOADS <br /> USING 1.0 PF LOAD BANKS <br /> TEST REPORTS PROVIDED <br /> NOTE: TEST WIlL BE CONDUCTED AT WAGNER POWER SYSTEMS <br /> AURORA. CO FACILITY PRIOR TO SHIPMENT <br /> Site Test: <br /> SITE INSTALLATION AUDIT <br /> BUILDING LOAD TEST <br /> AUTOMATIC START f STOP TEST AND DEMONSTRATION <br /> Terms and Conditions: <br /> Wagner Power Systems Terms lInd Conditions will apply <br /> FOB jobsite, not unloaded, not installed. <br /> Plus any applicable taxes <br /> Terms: Net 30 Days <br /> Quote is valid for- 90 days <br /> Exceutiolls llQ.d Exelll!'ions: <br /> . Delivery does not inelude off-loading or crane rental <br /> . Installation is not included <br /> . Power and control wiring installation not included <br /> . Site fuel fill and test fuel.are lUltinclnded <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.