Laserfiche WebLink
<br /> I <br />Air Conditioning/Refrigeration Work: .1 <br />First Five Tons (Air Conditioner - 60,000 BTU). . . . . . . . . . . . . . . . . . . . . . . $20.00 <br />Each Additional Ton (12,000 BTU). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.00 <br />First Five Tons (Duct Work - 60,000 BTU). . . . . . . . . . . . . . . . . . . . . . . . . 25.00 I <br />Each Additional Ton (12,000 BTU) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.00 <br />Ventilating Systems: I <br />Each Bathroom Exhaust Fan. . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . 5.00 <br />Minimum Fee. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25.00 <br />Inspections . <br />NEW: Case-by-case Basis, Refer to Inspector <br />ADDITIONS: Case-by-case Basis, Refer to Inspector <br />Commercial, Industrial and Instructional Mechanical Permit . <br />Fee. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $50.00+ <br /> 1-1/4% (0.0125 x value) total valuation of project I <br />State Surcharge. . . . . . . . . . . . . . . . . . . . . , . . , . . . . . . . . . . . $.50/$ I ,000 (0.0005 x value) <br /> valuation of project <br />(Value of work must include the cost of installations, alterations, additions or repairs I <br />including fans, hoods, HV AC units and heat transfer units, and all labor and materials <br />supplied by the contractor. In addition, it shall include all materials and equipment supplied <br />by other sources when these materials are normally suppplied by the contractor) . <br />admin.\finance\1997fees.\vpd .. <br /> I <br /> . <br /> I <br /> . <br /> I <br /> . <br /> I <br /> .. <br /> I <br />