My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-14-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 10-14-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:33 PM
Creation date
11/10/2006 4:05:22 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Kevin Ringwald <br />October 14, 1997 <br />Page 3 <br />. <br /> Therefore, as you can see, not only have our gross yields on these projects decreased over the last <br /> several months as a result of the additional requirements in connection with the reclamation of <br /> this land, we have also cut to the lowest possible level, the coverage of our internal overhead costs <br /> in connection with the project over the last two years. <br /> We are not making much money on these projects, bottom line. We need the City's help, and we <br /> believe that the combined projects suggested above, being the soils correction work in the amount <br /> of $250,000, together with additional exterior upgrades, would be an excellent package for <br /> recommendation to the Arden Hills City Council, particularly if financed and repaid through tax <br /> increments on these handsome new projects. <br /> RHZ:so <br />. <br />. <br />f:\developldz\Hrs\10\ringwaI2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.