Laserfiche WebLink
<br /> I <br /> I ARDEN HILLS PLANNING COMMISSION - DECEMBER 4. 1996 7 <br /> ~ Commissioner Sand asked why landscaping is being reduced from 70% to 62%. Ms. Adsit <br /> I explained the difficulty in determining existing landscaping from the surveyor's drawing. She <br /> advised the property is already fairly well screened and landscaping will be added to the south <br /> side as well as perimeter plantings around the building. <br /> I Commissioner Nelson asked if the applicant discussed these issues with City Staff. Mr. <br /> Ringwald stated they did and the applicant revised their submission. <br /> I Commissioner Larson asked if a condition should be included to address the percentage of <br /> opacity. Mr. Ringwald stated this is a good suggestion and recommended it require compliance <br /> I with the landscape plan. Ms. Adsit stated they will also supply a bond to assure compliance with <br /> the landscaping. <br /> I Commissioner Sand stated the entrance is up a set of steps on the north end of the church but the <br /> drainage and landscape plan shows the front entrance will be changed \vith a stairway from the <br /> I east and a landing. Ms. Adsit advised the overhead currently on display does not reflect this <br /> most recent revision. She used the overhead to inform of the entrance, retaining wall, buffering, <br /> and location of plantings. <br /> Ie Larson moved, seconded by Nelson to recommend approval of Planning Case #96-23, <br /> Special Use Permit Amendment (building expansions and parking lot improvements) and <br /> I Variances (Zoning Ordinance, Section VI, E, 6 and V,F,7) as shown on the site plan <br /> (revised November 15, 1996), based on the rationale and conditions as outlined in the <br /> staff report plus Condition No.9: screening opacity that exceeds 60% consistent with the <br /> . landscape plan. The motion carried unanimously (5-0). <br /> CASE #96-26 BETHEL COLLEGE. 3900 BETHEL DRIVE. SPECIAL USE PERMIT <br /> . AMENDMENT <br /> I Chair Erickson gave an overview of the public hearing process, then opened the public hearing at <br /> 8:25 p.m. <br /> . Chair Erickson requested verification of the public hearing notice. Mr. Ringwald verified notice <br /> of the public hearing in the Focus on November 21, 1996. <br /> I Mr. Ringwald advised the applicant, Bethel College, is requesting approval of an amendment to <br /> their Special Use Permit (SUP) by updating the Master Plan which guides development on the <br /> site. He explained that Bethel College is currently operating on a SUP which was issued in <br /> I March of 1978 in Planning Case #78-5. In September of 1980, the Master Plan was amended to <br /> allow for site plan approval of requests which were in conformance with the Master Plan. Mr. <br /> ~ Ringwald stated Staff concludes that the continuance of the site plan approval process for <br /> requests in conformance with the approved Master Plan is desirable. <br /> I <br />