Laserfiche WebLink
<br /> I <br /> I ARDEN HILLS PLANNING COMMISSION - DECEMBER 4. 1996 <br /> ~ 13 <br /> Commissioner Nelson noted the Staff recommendation to raze the caretakers building one year <br /> I after the next site plan review and questioned timing. Mr. Hjelle stated he does not have a time <br /> frame but anticipates an addition to the Fine Arts Building or completion of the Sports Complex <br /> will result in the next site plan review, perhaps within two to three years. He reiterated that he is <br /> I in the process of obtaining bids to raze the building. Commissioner Nelson asked if they would <br /> agree to raze the building within two years. Mr. Hjelle stated they would agree with two years. <br /> I Commissioner Larson noted this is a nonconforming use that has been abandoned for more than <br /> one year so the City Code requires it to be brought into conformance or demolished. Mr. <br /> Ringwald reviewed Section H of the Code which mentions "reasonable time frame or five years." <br /> I He eXplained that abandonment of a structure for more than one year changes the status from <br /> legal nonconforming to an illegal building. <br /> I Commissioner Sand stated an illegal building would not have to remain for five years and he <br /> believes if the applicant were to agree, the building could be demolished sooner. <br /> I Commissioner Sand raised the question of whether the triangular R -I parcel is part of the Master <br /> Plan. lf not part of it, he suggested the parcel be eliminated from the drawings contained in the <br /> Ie Master Plan. Mr. Ringwald explained that he had asked Bethel to included it to clarify the <br /> intention of the parcel. Commissioner Sand expressed support for an athletic field use, especially <br /> a shared City-use. <br /> I Commissioner Sand reviewed reference to the Campus Center which may exceed the height <br /> limit. He asked how defined an amendment to the SUP is and whether location, size, and height <br /> I are specifically addressed at this point. Mr. Ringwald advised if Bethel Colleges wants a <br /> building that exceeds 35 feet in height, they will have to make application for and meet the <br /> criteria for a variance. The building will also have to meet the setback requirements or relocate <br /> I the building or apply for a setback variance. Commissioner Sand stated he wants the record to be <br /> clear that no considerations are being given with regard to possible future variances. <br /> I Commissioner Carlson agreed and stated his impression that the proposed plan will require <br /> variances. Ms. V oda stated these concept drawings are not intended to indicate approval of <br /> I vanances. <br /> Commissioner Sand questioned where the height (35 feet) is measured from and to. Mr. <br /> I Ringwald read the definition of "building height" as contained in the Code. <br /> Commissioner Sand noted the four "skyway" or "bridge connections" between buildings and <br /> I questioned how the Building Code addresses this type of use. Mr. Ringwald explained the <br /> building and fire code. With regard to site plan review, it is considered as part of the building. <br /> fI' Commissioner Sand stated this is a building element not previously addressed by Arden Hills. <br /> I <br />