My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-10-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 02-10-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:39 PM
Creation date
11/10/2006 4:05:42 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I' ?, <br /> I CITY OF ARDEN HILLS <br /> ,. MEMORANDUM <br /> DATE: February 3, 1997 <br /> I TO: Brian Fritsinger, City Administrator <br /> I FROM: Dwayne Stafford, Public Works Superintendent Pf <br /> SUBJECT: Highway 96 Reconstruction Costs <br /> I Backg-round <br /> I The segment of Highway 96 from Mackubin Street in Shoreview west to Lexington A venue was <br /> identified as one (I) of the two (2) segments of the highway to be reconstructed in 1997. The <br /> Lexington Avenue and Highway 96 intersection will be completed during the reconstruction, <br /> I including turn lanes, and roadway to approximately 1380 feet west of Lexington Avenue. This <br /> will negate the need to closc this intersection during reconstruction of the Arden Hills segment <br /> between Lexington Avenue and Highway 10. <br /> I A meeting was held on January 29, 1997, with the Highway 96 Project Engineer, Mr. Jim <br /> Tolaas; Consulting Engineer with BRW, Mr. Gary Orlich; Project Engineer with MSA <br /> Ie Consulting, Greg Stonehouse; Community Development Director, Kevin Ringwald; City <br /> Administrator, Brian Fritsinger; and Public Works Superintendent, Dwayne Stafford to discuss <br /> I two (2) issues related to Arden Hills as part of the Shorevicw segment. <br /> Issucs <br /> I 1. Storm Sewcr <br /> A significant amount of storm sewer and ponding areas will need to be constructed as <br /> part of the Shoreview scgment. Ramsey County engineers estimate the cost of this work <br /> I to be $977,000, and 78 percent of this amount will be paid by State Aid Funding. <br /> However, upon completion of a run off study, the County estimates that two (2) percent <br /> of these costs will be assessed to the City of Arden Hills and 20 percent lo Shoreview. <br /> I 2. Emergency Vchicle Preemption System (EVP) <br /> The County intends to install an EVP System with the new traffic signals at Highway 96 <br /> I and Lexington A venue. Typically, the County charges the affected Cities for this system. <br /> This would mean a 50/50 split between Arden Hills and Shoreview. <br /> 1 Costs <br /> The estimated cost to Arden Hills would be $19,544 for storm sewer and $5,000 for the EVP <br /> I System. These costs would come from the 409 fund (Non Assessable Road Improvements). <br /> it <br /> I <br /> -------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.