Laserfiche WebLink
<br /> - <br /> - ESTI~ATEO COST PARTICIPATIOH SUMMARY PR[HTED: 28~Jan"~~ <br /> , <br /> - I <br /> ) GROUP 3 - EHGIHEER'S ESTIMATE AND COST PARTICIPATIOH <br /> PROJECT, COUHTY ROAD G (FORMERLY T.H. 96) <br /> e FROM LEXINGTON AVE. TO MACKUBIN ST. <br /> S.A.P.62-696.04C.T.B., M.S.A.P. GROUP 3 <br /> I DATE' JANUARY 20, 1997 100X CITY OF SHOREVIE~ <br /> UNIT TOTAL <br /> ITEM NO. CONTRACT ITEM UNIT PRICE QUANT ITY QUANllTY AMOUNT <br /> I ============================================================================================================================ <br /> 2021.501 MOBILIZATION LS $200,000.00 1 0.05 $10,000.00 <br /> 2104.501 REMOVE DIP PIPE SE~ER m $20.00 110 110 $2,200.00 <br /> 2104.501 REMOVE ~ATER~lN m $15.00 24 4 $60.00 <br /> I 2104.501 REMOVE ~ATERMAIN SERVICE LEAD m $12.00 120 120 $1,440.00 <br /> 2104.523 SALVAGE HYDRANT EACH $SOO.OO 3 3 $2,400.00 <br /> 2104.523 SALVAGE GATE VALVE AND BOX EACH $500.00 6 6 $3,000.00 <br /> 2104.525 ABANDON ~ATERMAIN m $4.00 365 365 $1,460.00 <br /> I 0433.605 RECONSTRUCT PILE CAP EACH $500.00 16 16 $8,000.00 <br /> 0503.6(12 JOINT TEST & SEAL EACH $10.00 200 200 $2,000.00 <br /> 0503.602 RECONSTRUCT MANHOLE INVERT EACH $250.00 1 1 $250.00 <br /> 0503.603 SE~ER MAIN CLEANING m $7.50 900 900 $6,750.00 <br /> 0503.603 225mm SANITARY SE~ER SPOT REPAIR m $225.00 10 10 $2,250.00 <br /> I 0503.603 250 mm SANITARY SE~ER SPOT REPAIR m $250.00 3 3 $750.00 <br /> 0503.603 200 mm DUCTILE IRON PIPE SE~ER CL 52 m $110.00 110 110 $12,100.00 <br /> 0504.602 CONNECT TO EXISTING CURB BOX EACH $200.00 8 8 $1,600.00 <br /> 0504.602 HYDRANT EACH $1,700.00 5 5 $S,500.00 <br /> I 0504.602 150 mm GATE VALVE AND BOX EACH $500.00 5 5 $2,500.00 <br /> 0504.602 200 mm GATE VALVE AND BOX EACH $750.00 2 2 $1,500.00 <br /> 0504.602 25 mm CURB STOP & BOX EACH $100.00 I 1 $100.00 <br /> 0504.602 600mm X 200mm ~ET-TA? ~/ GATE VALVE & BOX EACH $4,000.00 I 1 $4,000,00 <br /> 0504.602 30Dmm X 200mm UET.TAP u/ GATE VALVE & BOX EACH $1,500.00 1 1 $1,500.00 <br /> I 0504.602 CONST. KANHOlE OVER EXIST. 600mm VALVE EACH $2,500.00 4 4 S10/000.00 <br /> 0504.602 IRRIGATION SERVICE TAP ~ITH BOX EACH $750.00 2 2 $1,500.00 <br /> 0504.603 150 mm UATERHAIN DUCTILE IRON CL. 52 m $80.00 28.5 28.5 $2,280.00 <br /> 0504.603 200 mm ~ATERHAIN DUCTILE IRON CL. 52 m $95.00 796.5 796.5 $75,667.50 <br /> 0504.603 25 mm TYPE X COPPER PIPE m $50.00 160 160 $S,OOo.OO <br /> Ie 0504.603 100mm ?VC PIPE CASING - IRRIGATION m $20.00 741 741 $14,820.00 <br /> 0504.620 DUCTILE IRON FITTINGS KG $5.00 500 500 $2,500.00 <br /> 052\.602 100 mm COHCRETE ~ALK - SPECIAL m2 $35.00 700 700 $24,500.00 <br /> 0565.603 50 HM RIGID STEEL COHOUIT m $36.00 741 741 $26,676.00 <br /> I ============================================================================================================================ <br /> GROUP 3 TOTAL $238,303.50 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> f' <br /> I PA.GE 5 RAMSEY COUNTY PUBLIC ~RKS ESTlMATE.'HK3 <br />