My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-10-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 02-10-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:39 PM
Creation date
11/10/2006 4:05:42 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> - <br /> - , \.. <br /> - <br /> - <br /> AGREEMENT FOR MAINTENANCE <br /> 'e OF TRAFFIC CONTROL SIGNALS AND EVP SYSTEM <br /> AGREEMENT NO, 97008 <br /> I <br /> I THIS AGREEMENT, made and entered into by and between the County of Ramsey, <br /> Department of Public Works, hereinafter referred to as the "County," and the City of Arden Hills <br /> I hereinafter referred to as "Arden Hills, and the City of Shoreview hereinafter referred to as <br /> "Shoreview", for the maintenance of a traffic control signal system with street lights, signs, <br /> interconnect and emergency vehicle pre-emption at the intersection of Highway 96 and Lexington <br /> . Avenue; <br /> WITNESSETH: <br /> . WHEREAS, the County has determined that there is justification and it is in the public's best <br /> . interest to install traffic control signals with street lights and signs at Highway 96 (County State Aid <br /> Highway No. 96) and Lexington Avenue (County State Aid Highway No, 51); and <br /> . WHEREAS, Arden Hills and Shoreview requested and the County agrees to provide an <br /> Emergency V chicle Pre-emption System, hereinafter referred to as the "EVP System" as a part of said <br /> traffic control signals with street lights in accordance with the terms and conditions hereinafter set <br /> .e forth; and <br /> WHEREAS, construction costs of the traffic control signals with street lights, signs, <br /> . interconnect and emergency vehicle pre-emption will be shared between the County, Arden Hills and <br /> Shoreview in accordance with a separate Ramsey County Agreement for the eonstlUction of Highway <br /> 96, State Aid Project No. 62-696-04 CTB; and <br /> . WHEREAS, the County, Arden Hills and Shoreview will participate in the maintenance and <br /> operation of said traffic control signals with street lights, signs, interconnect and EVP system as <br /> . hereinafter set forth. <br /> NOW, THEREFORE, IT IS AGREED AS FOLLOWS: <br /> . \. The County shall install or cause the installation of said traffic control signals with street <br /> lights, signs, interconnect and EVP systcm in accordance with the plans and specification for State <br /> . Project No, 62-696-04 CTB at Highway 96 and Lexington A venue. <br /> 2. The County shall install or cause the installation of an adequate electric power supply to the <br /> . service pad including any necessary extensions of power lines. Upon completion of the traffic control <br /> signals with street lights and EVP system installation, necessary electrical power for their operation <br /> . shall be at the cost and expense of the County. In accordance with the Policy for lighting County <br /> Roadways, County Board Resolution 78-1394, the County shall maintain and pay energy costs of the <br /> ~ integral street lights in each corner. <br /> . 97008- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.