<br /> PRELIMINARY PRIORITIZATION OF G.B.D. EXPENDITURES I
<br /> Expenditure Cost Cumulative Cost .1
<br /> Naegele/Zafke Strip acquisition $50,000 $50,000
<br /> Indykiewicz acquisition $741,000' $791,000
<br /> Indykiewicz relocation $75,000 $866,000 I
<br /> Indykiewicz demolition $20,000 $886,000 I
<br /> Signals at Highway 96 $125,000" $1,011,000
<br /> Road near Highway 96 $300,000" $1,311,000 I
<br /> Bridge over 1-35W $200,000" $1,511 ,000
<br /> New Infrastructure'" $600,000 $2,111,000 I
<br /> A TS Steel $1,500,000 $3,611,000
<br /> TruWer/Zafke $131,000 $3,742,000 I
<br /> Harstad $865,000 $4,607,000
<br /> Naegele $2,500,000.... $7,107,000 I
<br /> Vaughn $820,000..... $7,927,000 ..
<br /> Total NA $7,927,000
<br /> . 296,534 square feet x $2.50 per square foot
<br /> .. City's cost, total cost of expenditure to be picked up by others. I
<br /> ... Relocated road (Butcher's Street), water, sewer, and storm sewer
<br /> **** 848,836 square feet x $3.00 per square foot I
<br /> ..... Does not include tower (land @ $1.00 per square foot)
<br /> Work Proe-ram I
<br /> The Staff has prepared a detailed work program for the GBD (Exhibit C). The purpose of the
<br /> work program is to layout the rationale approach for dealing with myriad of personnel, actions,
<br /> and time constraints which exist in this project. Each sheet in the work program represents an I
<br /> area of tasks which need to be performed, including the Staff assumptions of potential actions
<br /> required by the City Council and/or EDA. I
<br /> The Staff will be presenting a detailed presentation of the issues related to the work program at
<br /> the work session. I
<br /> Requested Action
<br /> None. The Staff is only requesting City Council direction on these items. I