My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-12-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 05-12-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:45 PM
Creation date
11/10/2006 4:06:11 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. DRAFT <br /> ARDEN HILLS CITY COUNCIL -APRIL 28.1997 5 <br />I Mayor Probst stated his opinion that the fire access road not be constructed of gravel. He further <br />~ stated the Fire Department will most likely require a fire access road around the entire building. <br /> A representative of Welsh Construction, contractor for the church facility, stated they had also <br />I asked the Lake Johanna Fire Department for direction, and had not yet received a reply. <br /> Councilmember Hicks requested clarification that drainage from this proposed addition was to <br />. the south of the David Cmiel property. Mr. Ringwald replied that was correct. <br /> Councilmember Hicks inquired as to the method of drainage from this site, Mr. Ringwald <br />I replied water drained into a storm sewer, which then drained into wetland basins. <br /> Councilmember Hicks inquired if the southern drainage pond was a temporary holding pond. <br />I Mr. Ringwald replied that it was a temporary holding pond, which then ran through a pipe and <br /> was discharged into the County highway system, which had a rate control system placed upon it. <br />I Councilmember Hicks inquired if this drainage method was now in place on this site. Mr. <br /> Ringwald replied this drainage would be included in the Phase II construction. <br />I Councilmember Hicks requested clarification that the temporary truck trailers would be removed <br /> from the site. Mr. Ringwald stated that was correct. <br />Ie Councilmember Hicks inquired when the lighting on the existing religious symbol was being <br /> turned off at night. Mr. Ringwald replied that it was currently being turned off at I I :00 p.m. <br />. Councilmember Hicks remarked that many surrounding neighbors had expressed concerns <br /> regarding this lighting at the Planning Commission meeting held on April 2, 1997. <br />I Mr. Logelin stated that a timer for the symbol had been ordered, and I I :00 p.m. was the <br /> anticipated time for the timer to turn off the lighting. He stated the church would be willing to <br /> discuss resetting the timer to accommodate neighboring residences, <br />I Councilmember Hicks inquired if the applicant had been aware of the neighbors' complaints <br />I prior to the April 2, 1997, Planning Commission meeting. Mr. Logelin stated they had not been <br /> aware of any complaints before that time. <br />I Councilmember Hicks suggested the lighting timer be timed to coincide with church events and <br /> activities. He further suggested resetting it during times ofrain or snow, which seemed to <br /> enhance the light and make it brighter. <br />I Councilmember Aplikowski stated the lights also helped people find their bearings in inclement <br /> weather, but she had not been aware of the neighborhood concerns. She further stated she <br />I wanted to be certain the complaints had to do with the brightness of the symbol, and not the <br /> symbol itself. <br />t' <br />I <br />---------..-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.