Laserfiche WebLink
<br />I <br />I developments, labeled as Phases I through IV. Moreover, the scope of this report includes a <br />.- <br /> presentation of the District's existing conditions followed by a summary of the various <br /> improvements proposed within the area. These improvements include two alternate concepts for <br />I sanitary sewer, watermain installation, storm sewer installation, two alternates for street <br /> improvements, and various streetscaping amenities for me City's consideration. A section is also <br />I included in this report outlining the various existing easements and rights-of-way that must be <br /> considered in the achieving the optimal development of the area. <br />I Finally, the costs associated with each component of the project are also presented, followed by <br /> a proposed schedule to facilitate construction during the summer of 1997 and into the summer of <br />I 1998. The costs presented within this report include estimates for construction of the various <br /> improvements with a 5% contingency cost and a 32% overhead factor to account for engineering, <br />I administration, legal, and fiscal expenses that the City may incur in the making of these <br /> improvements. <br />I EXISTING CONDITIONS <br />Ie The following section of this report will outline the existing utility, drainage, and street conditions <br />. currently present throughout the project site. <br />I Sanitary Sewer <br /> The project site is currently served with sanitary sewer service from two separate branches of the <br />I City's sewer collection system, as presented on Exhibit 3. The City currently maintains an 18- <br /> inch reinforced concrete pipe (RCP) trunk sewer main which flows from east to west across the <br />. southerly portion of the District. This large diameter trunk sewer main is the primary discharge <br /> line for the entire City of Arden Hills into the Metropolitan Council for Environmental Services' <br />. (MCES) overall metropolitan wastewater collection system. This trunk sewer is currently capable <br /> of serving those properties located immediately adjacent to 13m Street NE, and at the easterly <br />. limits of the proposed street immediately north of the Minnesota Transfer rail spur. <br />I In addition to the trunk sewer main, an 8-inch PVC sanitary sewer extends south from Highway <br /> 96 along an easement situated on the back lot lines of the existing businesses adjacent to West <br />.- Round Lake Road. This sewer either currently serves or is capable of serving all of those <br /> properties north of, and including, Welsh Companies' Phase I development. <br />I <br /> FEAS-520,089 .2- 520-089-10 <br /> ---- -~ <br />