My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 05-03-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 05-03-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:46 PM
Creation date
11/10/2006 4:06:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . <br /> Higher education space will consist of principally open space utilizing the 12' <br /> ceilings that the Building provides. <br /> External modification includes the following: <br /> >- Install glazing in current drive-in opening. <br /> >- Install new tenant vestibule(s) on east face of Building. <br /> >- Install approximately 26 new windows or combination thereof. <br /> >- Install new fascia on east and north face of Building with stone or similar <br /> wainscoting. <br /> >- Install exterior Building lighting. <br /> As an example of the quality of work performed by the Building Owner, I have attached <br /> a before and after photograph of a building located on County Road E in Arden Hills <br /> renovated for Anchor Bank. An affiliate of The Davidson Companies, owner of The <br /> Anchor Bank building converted the former MSI Claims Center building into a modern <br /> award winning Anchor Bank facility. <br /> . <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.