Laserfiche WebLink
<br /> - <br /> I <br /> I CITY OF ARDEN HILLS, MINNESOTA <br /> CONTRACT 97-C/1 METER <br /> ,. REPLACEMENT OF COLD WATER METERS <br /> To the City Council of the City of Arden Hills: <br /> I The individual or corporation signing this document has examined the Contract Documents, <br /> including Advertisement for Proposals. Instructions to Bidders, Contract Conditions. Form of <br /> I Contract, and detailed specifications, and hereby proposes to fumish all materials and <br /> equipment for the replacement of cold water meters and installation of radio reading devices and <br /> to perform such work in accordance with the Contract Documents at the following prices. <br /> The City of Arden Hills agrees to take possession of 50% of all materials within six (6) months <br /> I of the contract award; the remaining 50% by June 30. 1998. The supplier agrees to have available <br /> for pick up, all ordered materials within 5 working days of an order, understanding the Cily may <br /> pick up materials in quantities of 24 or more. <br /> I UNIT <br /> ITEM UNIT QTY. PRICE TOTAL <br /> I A. COMMERCIAL COLD WATER METERS <br /> 1. Fumish Meters and Radio Reading <br /> I Devices for commercial applications: <br /> 5/8" x 3/4" Disc meter (Model 25) EA 28 <br /> 3/4" x 9" Disc meter (Model 35) EA 30 <br /> .. 1" Disc meter (Model 70) EA 102 <br /> 1-1/2" Disc meter (Model 120) EA 56 <br /> 2" Disc meter (Model 170) EA 35 <br /> I 2" Turbo meter EA 15 <br /> 3" Turbo meter EA 1 <br /> 4" Turbo meter EA 1 <br /> I 2" Compound meter EA 1 <br /> 3" Compound meter EA 7 <br /> 4" Compound meter EA 6 <br /> 6" Compound meter EA 2 <br /> I 10" Compound meter EA 1 <br /> I 2. Furnish Radio Read Transmitter EA 30 <br /> Registers and Remote Transponders <br /> Only for Existing Disc and Turbo <br /> I Commercial Meters Which Can Be <br /> Upgraded to Radio Read. <br /> I 3. Fumish Radio Read Transmitter EA 10 <br /> Registers and Remote Transponders <br /> I Only for Existing Compound Meters <br /> Which Can Be Upgraded to Radio Read. <br /> it 4. Commercial meters will be installed <br /> by City Utility Personnel <br /> I 5 <br />