Laserfiche WebLink
<br />. <br />.- CITY OF ARDEN HILLS <br /> MEMORANDUM <br />. <br /> DATE: May 21, 1997 <br />I TO: Brian Fritsinger, City Administrator <br />I FROM: Dwayne Stafford, Public Works Superintendent 9). <br />I SUBJECT: Monthly Department Head Report <br /> Public Safetv Commission <br />I The Public Safety Commission met on May 15 at the Public Works Garage. The following <br /> topics for discussion were on the agenda. <br />I 1. Review of the information provided by Lake Josephine Improvement Association <br /> concerning ordinances relating to Lake Josephine. <br />. 2. Review of the Arden Hills Fire Protection Agreement. <br />.e 3. Review of 1997 Commission guidelines. <br /> No recommendations were made at this time; however, the commission will be kept informed of <br />I any developments on Lake Josephine ordinances. Mr. Stafford will be contacting Steve North of <br /> Roseville for information as to Roseville's position on this issue. <br />. Public Works Department <br /> Public Works crews have completed street sweeping operations for this season, and spent nine <br /> (9) days crack filling streets. Several more storm sewer catch basins have been rebuilt which had <br />. caved in and several remain to be repaired. Plows and sanders are being removed, pressure <br /> washed and sprayed with a rust protector. This equipment is then stored at the large water tower. <br /> Black top repair has started again, and patching at four (4) winter water main breaks should be <br />. completed this week. <br /> Public Works personnel and John Hemming of MSA reinspected the south water tower to verify <br />I recommendations of the previous inspection by Pittsburg Tank and Tower. Public Works is <br /> expecting a report from Mr. Hemming to show significantly less work needed than that proposed <br /> by Pittsburg Tank and Tower. <br />I The Public Works Superintendent did a final inspection on the Kerth Lake Storm Sewer project <br />. completed in 1996, and found two (2) segments of pipe had settled and show signs of collapsing. <br /> A letter was sent to the City Engineer and contractor stating this was not acceptable, and the <br />.- contractor has agreed to replace the pipe. <br />I <br />