My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-27-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 05-27-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:48 PM
Creation date
11/10/2006 4:06:19 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I DRAFT <br /> ~B.DEN lilkLS CITY COUNCIL - MAY 12. 1997 5 <br /> I <br /> (' Councilmember Malone inquired the extent of patching necessary on County Road F, Mr, <br /> Stafford replied mainly patching of numerous potholes was needed, <br /> I Mr, Fritsinger stated the Resolution does not discuss repairs, and this issue will have to be <br /> discussed with the County. <br /> I D. Preliminary Gateway Business District Improvements, Feasibility Report Discussion <br /> Mr. Kevin Ringwald, Community Development Director, showed an overhead slide of the <br /> I Gateway Business District, explaining that Phase I was currently under construction, and Phase <br /> II, III, and IV will come before the Planning Commission for discussion on June 18, 1997. <br /> I The scope of the feasibility report is for roads and utilities required south of the Indykiewicz <br /> parcel and west of the Vaughn parcel. <br /> I Mayor Probst inquired if the road and utilities servicing the Vaughn parcel were satisfactory. <br /> Mr. Ringwald stated this parcel would be evaluated at a future date, given the existing tower on <br /> the property. <br /> I Mayor Probst suggested checking the implications regarding utilities for the entire district. <br /> .. Mr, Greg Stonehouse, came before the Council to explain the Preliminary Feasibility Study. He <br /> reviewed the cost of the study and a schedule of the proposed project. <br /> I Mr. Stonehouse showed an overhead slide of the sewer lines, and one of the water mains. He <br /> gave a general overview of the work to be completed, including 10cations where sewer and water <br /> I pipes would need replacement, and where storm sewers would need to be added. He also <br /> discussed drainage, roadway improvements, and trails and sidewalks in the area. He discussed <br /> an NSP easement and a V.S, Pipeline easement in the area and how these easements would be <br /> I handled. <br /> Mr, Stonehouse discussed project costs as broken down into stages, and showed a project <br /> I schedule. The final plan will be presented to City Council on May 27, 1997. <br /> I Mayor Probst inquired regarding the schedule of reconstruction as it pertains to the bridge, Mr, <br /> Fritsinger indicated the bridge was scheduled for reconstruction in 1999. Mr. Fritsinger also <br /> indicated the Feasibility Study will be studied further by the City and staff to address remaining <br /> I questions and concerns. He indicated the developer had also expressed interest in constructing <br /> the road for the City. <br /> I Mayor Probst inquired what type of street was planned, and indicated his preference for a <br /> boulevard design to allow for more flexibility and aesthetics. He inquired how the Highway 96 <br /> it project and this project would be coordinated. Mr. Fritsinger indicated a meeting was scheduled <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.