My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-28-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 07-28-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:53 PM
Creation date
11/10/2006 4:06:47 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ----.. <br /> ~ ~I <br /> ~-r- ~.~., _.~.~ <br /> H r' j ~ ~"~ 1 \ I r'~ l ' <br /> ~_ ---.. :._t " "" ,.J <br /> ,jUL 1 0 1997 I <br /> Cjfy"f "'Li' 'I M~l <br /> lJ ';\~ '!:d riLl" -I <br /> Howard R. Green Company <br /> 1II\\ltTlll:ml\IIR\ <br /> CONSULTING ENGINEERS Formerly MSA <br /> Consulring Engineers I <br /> MEMORANDUM <br /> TO: Dwayne Stafford I <br /> Public Works Superintendent <br /> City of Arden Hills <br /> FROM: John R. Hemming, P,E. I <br /> DATE: July 10, 1997 I <br /> RE: 1,000,000 (1,0 MG) Water Tower <br /> FILE: 520,085,10 I <br /> As requested, we have reviewed the 1996 Pittsburg Tank and Tower inspection report for the I <br /> 1.0 MG Water Tower. In order to properly review the report, a brief re-inspection of the water tower <br /> was performed, The water tower was constructed and painted in 1987 and is in overall very good <br /> condition, .. <br /> The Pittsburg Tank and Tower recommendations and price quotes are summarized below, Our <br /> comments and recommendations are listed to the right of the Pittsburg Tank and tower comments, 1 <br /> Pittsburg Tank and Tower Company Howard R. Green Company I <br /> Recommendations and Quoted Price Comments and Recommendations <br /> 1, Drill drain holes in the condensate Not necessary nor recommended, Defeats I <br /> ceiling; $710 the purpose of the condensate ceiling, <br /> 2, Replace all ladders and safety climb The City has installed updated safety climb I <br /> devices; $22,341 devices, The ladders are generally in <br /> compliance with OSHA and AWWA <br /> (American Water Works ASSOCiation) I <br /> requirements and standards, Ladder <br /> Replacement is not necessary, However, <br /> minor modifications are recommended to I <br /> provide adequate toe clearance at the <br /> condensate ceiling, Estimated cost: <br /> $1,500, I <br /> .. <br /> 1326 Energy Park Drive' St. Paul, MN 55108 . 612/644,4389 fax 612/644,9446 loll free 800/888,2923 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.