My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-25-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 08-25-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:56 PM
Creation date
11/10/2006 4:07:01 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I' , ~ ~~ p~ <br /> ? <br /> ARDEN HILLS CITY COUNCIL - AUGUST 11, 1997 U 3 <br />. Mayor Probst inquired if this action would have implications for the Ramsey County trail under <br />.- <br /> consideration. Mr. Ringwald agreed there could be implications in the future. <br /> B. Resolution #97-40, Authorizing a Preliminary Feasibility Report in the Matter ofthe <br />. 1998 Street Improvement Project <br /> Mr. Greg Stonehouse, City Engineer, reviewed the letter from Howard R. Green Company to the <br />. City dated August 8, 1997, outlining the scope of the planned street improvements for 1998. He <br /> stated adoption of this resolution would allow his company to proceed with the preparation of the <br />. preliminary report for 1998 street improvements, as required by MN statute. <br /> Mayor Probst inquired what work is slated to be done on the roads listed on the resolution. Mr. <br />. Stonehouse replied the list includes seal-coating, reconstruction, and overlay. He further stated <br /> West Round Lake Road is included on the schedule for now, but can be dropped if necessary. <br />. Mayor Probst inquired if the City will be making arrangements with Ramsey County for their <br /> share of the cost on the Stowe Avenue project. Mr. Stonehouse replied this was being done. <br />I Mayor Probst inquired if the New Brighton side of Stowe Avenue was to be paid for by New <br /> Brighton. Mr. Stonehouse replied the assessments on this street will be for Arden Hills residents <br /> only. <br />.. Councilmember Hicks remarked the list of proposed streets seems rather lengthy for a <br /> preliminary study. Mr. Stonehouse replied he took some of the information from the 1997 street <br />. improvements, and preparing an aggressive list allows the City to choose the street projects as <br /> they see fit while staying within the budget. <br />I Councilmember Keim stated the New Brighton side of Stowe Avenue has residents with water <br /> problems, i.e. wet basements, and inquired how the cost of improvements to the water main <br />I would be split between New Brighton and Arden Hills. Mr. Stonehouse stated they are looking <br /> at the possibility of New Brighton covering the cost of the water main and Arden Hills covering <br /> the cost of the sanitary sewer. Those items will be resolved as part of the feasibility report. <br />I MOTION: Hicks moved and Aplikowski seconded a motion to adopt Resolution #97-40, <br /> authorizing a preliminary feasibility report in the matter of the 1998 street <br />. improvement project. The motion carried unanimously (4-0). <br /> C, South Water Tower, Approve Plans & Specifications <br />I Mr. Stonehouse reviewed the memo from Howard R. Green Company dated August 8, 1997, <br /> specifying the work being proposed for the south water tower. This work, which is being done <br />I mainly for safety issues, includes the following: <br />t' <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.