My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-08-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 09-08-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:57 PM
Creation date
11/10/2006 4:07:05 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br />'. I. INTRODUCTION <br />, On August 11, 1997, the Arden Hills City Council initiated the Minnesota State Statue <br /> 429 process by adopting Resolution 97-40, authorizing Howard R. Green Company, <br />, Consulting Engineers, to prepare a feasibility study for the 1998 Street Reconstruction <br /> and Maintenance Improvement Project. This feasibility study will address the <br /> reconstruction, bituminous rehabilitation, and seal coating of selected streets within the <br />, City of Arden Hills. The selected streets proposed for reconstruction, bituminous <br /> overlay, and seal coating are shown on Exhibit I and presented in the table below. <br />, TABLE 1 <br /> 1998 STREET RECONSTRUCTION AND MAINTENANCE IMPROVEMENTS <br /> A. RECONSTRUCTION <br />, STREET FROM TO LENGTH (ft) <br /> Valentine Court Valentine Avenue Cul-de-sac 510 <br /> Fairview Avenue County Road F Gramise Road 1,300 <br />,. North Hamline Avenue County Road E Dead End 890 <br /> (service road) (north) <br />,. North Snelling Avenue Arden Place Cul-de-sac 850 <br /> (service road) <br /> Indian Place County Road E Cul-de-sac 150 <br />-t Edgewater Avenue New Brighton Road 3 lOft west of Prior 1,170 <br /> Avenue <br />- Stowe Avenue Cleveland Avenue New Brighton Road 1,330 <br />'I West Round Lake Road Highway 96 13111 Street N.E. 3,500 <br /> B. BITUMINOUS OVERLAY <br /> STREET FROM TO LENGTH (ft) <br />, Thom Drive Cleveland Avenue New Brighton Road 2,170 <br /> Edgewater Avenue 310ft west of Prior Cul-de-sac 890 <br />, Avenue <br /> GIenpaul Avenue New Brighton Road Cleveland Road 2,400 <br /> Sandeen Road Lake Johanna Lake Johanna 1,300 <br />, Boulevard Boulevard <br /> Lake Lane Lake Johanna West End 1,210 <br /> Boulevard <br />., C. SEAL COATING <br /> STREET FROM TO LENGTH (ft) <br /> Glenhill Road Highway 5 I Asbury Avenue 1,100 <br />, Crystal Avenue Fairview Avenue County Road F 1,050 <br /> Dellview Avenue Crystal Avenue Gramise Road 490 <br />'. Norma Circle West Floral Drive Cul-de-sac 350 <br /> Gale Circle West Floral Drive Cul-de-sac 560 <br /> James Circle West Floral Drive Cul-de-sac 900 <br />, Dunlap Street Red Fox Road Grey Fox Road 1,360 <br />, FEAS.800,870 I 80<l870j-0030 <br />
The URL can be used to link to this page
Your browser does not support the video tag.