My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-29-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 09-29-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:13:59 PM
Creation date
11/10/2006 4:07:11 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I' DRAFT <br /> ARDEN HILLS CITY COUNCIL - SEP'!EMBER 8 J997 7 <br /> I <br /> f' 1. Compliance with the approval of the Rice Creek Watershed District (Permit #96-105); <br /> 2. Preservation of those trees shown in the Tree Preservation Plan; <br /> 3. Payment of the appropriate park dedication fee; and <br /> 4. Provision of an updated abstract of title and a development contract prior to consideration <br /> I of the final plat by the City Council. <br /> 1 He noted that the City Council also authorized the payment of park dedication ($5,124.00) to be <br /> paid in one-fourth (114) increments at the time of issuance of the building permits for the four <br /> lots on which new construction is planned. <br /> I Mr. Ringwald advised the applicant had provided Staff with the updated abstract oftitIe. Staff <br /> had reviewed the development agreement and found it acceptable. <br /> I MOTION: Keirn moved and Malone seconded a motion to approve Planning Case #95- I 6, <br /> subject to the four conditions as stated above. The motion carried unanimously <br /> I (3-0). <br /> Mayor Probst inquired whether this case had been before Council at an earlier date. Mr. <br /> . Ringwald replied that it had been. <br /> F. Cummings Park, Trail Washout, Award Bid <br /> Ie Ms. Cindy Walsh, Parks & Recreation Director, stated bids had now been received for repairs to <br /> the Cummings Park Trail washout, as directed by Council at its August 1 I, 1997, regular <br /> . meeting. The engineer's estimate for the repairs was $42,000-$50,000. Rehbein Construction <br /> submitted a bid for $30,905. The contractor would be able to begin this project on September <br /> . 11th, with an anticipated completion date of October 15th. <br /> Ms. Walsh stated that reimbursement funds had been applied for through the Federal Emergency <br /> . Management Agency (FEMA) Program. At this time, it is believed that 75% of the eligible costs <br /> for repairing the washout will be reimbursed to the City, although it is not known when the <br /> reimbursement will take place. The washout area has not yet been inspected by FEMA <br /> 1 inspectors. However, repair work can begin before this area is inspected, as the Ramsey County <br /> Emergency Management had reviewed the area, and pictures had been taken of the damage. <br /> I Ms. Walsh stated she recommends accepting the bid and executing the contract with Rehbein <br /> Construction for the Cummings Park Washout Project, and applying for any eligible funds from <br /> FEMA for disaster relief repair of public property. <br /> I Mayor Probst inquired if all funds would be eligible for reimbursement. Ms. Walsh replied she <br /> . believed all or a majority of the funds would be reimbursed. <br /> Mayor Probst requested clarification that the action necessary at tonight's meeting was <br /> .. acceptance of the bid. Ms. Walsh stated that was correct. <br /> I - ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.