Laserfiche WebLink
<br /> I f,(Cl5 <br /> I SITE DESCRIPTION <br /> f' The project lies at the northeast comer of Interstate 35W & Highway 694; The northeast comer of the <br /> site follows the boundary of the Round Lake National Wildlife Refuge. The current site has several small <br /> I wetland depressions, an abandoned farm with two barns and a house, an existing horse pasture, and <br /> several patches of disturbed woodland. Every effort was made through the site design to minimize <br /> environmental impact and to mitigate unavoidable issues. <br /> I Welsh Development Company proposes to locate three buildings of approximately 107,000 square feet <br /> each on separate subdivided parcels. The design includes several detention ponds and an off-site <br /> I regional pond, which will collect excess storm water runoff. In addition, an expanded wetland complex <br /> is proposed in the southeast comer ofthe site to meet the mitigation requirement for filling existing <br /> wetland areas. A new public road (Oateway Boulevard) is also proposed along the south boundary to <br /> allow access to the developments. Access to the site is also available via Round Lake Road West and the <br /> I proposed Round Lake Court Cul-du-sac. <br /> Due to the scope of this project, an EA W was submitted and the City (the ROU) reached a negative <br /> I decision on the need for an Environmental Impact Statement (EIS). <br /> Adiacent Land Use <br /> I Adjoining the site to the northeast is the Round Lake National Wildlife Refuge, currently zoned by the <br /> Department of Natural Resources as "62-70 Recreational Development." To the west of the site is <br /> Ie Interstate Highway 35W and to the south is Highway 694. A horse pasture, containing a radio tower, <br /> borders the site on the east. <br /> I DEVELOPMENT STANDARDS <br /> I The proposed office/warehouse development is designed to meet or exceed the (OB) industrial zoning." <br /> district's standards. The required building size, parking ratio, and landscaping all fall within the <br /> regulations outlined in the OB section of the ordinance, The building and parking setbacks meet the <br /> I intent of City requirements while enhancing the natural characteristics of the land. Intensive landscaping <br /> has been proposed throughout the site to maintain a positive image from public right of ways. <br /> I It is proposed that all ofthe parking and service drive areas have a bituminous surface with B612 <br /> concrete curb and gutter throughout the site, with typical lighting standards which have levels that will <br /> comply with the City of Arden Hills code requirements. <br /> I <br /> . <br /> I <br /> -- HKS ASSOCIATES, INC. Page 4 GATEWAY BUSINESS CENTER <br /> September 17, 1997 for Welsh Development Co., LLC <br /> ~."'''''''''''"'''" <br /> J.,\~P''',,''! .~"d1'n'.I(Sf <br /> . . l<-,,'r~("'''''~l.\'. ~n"'l,~1:5 <br /> l'ItI'.\:O<P'-""'"'' <br /> .. - ... ' ':.H;"IlI~' n,,," ~~M'l<:f.' <br />