Laserfiche WebLink
<br /> - <br /> I <br /> . . <br /> I 18. Modification of the building's exteriors (Phase II, III, and IV) as outlined in Findings- <br /> t' Variance #5, items 2-13. <br /> 19. Modification of the parking spaces to eliminate the variance as outlined in Findings - <br /> Other Variances, item 3. <br /> 20. Provision of the necessary drainage and utility easements on the plat. <br /> . 21. Provision of the necessary access easements (Vaughn Towers) on the plat. <br /> 22. Extension of the relocated 14th Street to the southeastern-most portion of Lot 3. <br /> 23. Payment and/or dedication of park land as recommended by the Parks and Recreation <br /> . Director. <br /> 24. Execution of all development agreements prior to consideration of the final plat by the <br /> City Council. <br /> I 25. Provision of revised design with more 3-D relief for the entrances and sides of Phase II <br /> building to the City Council. - <br /> 26, Approval by the Fire Chief of all building address locations. <br /> I The City Council on July 14, 1997, approved the PUD Master Plan, including Landscape Plan <br /> I and Variances, and Preliminary Plat in Planning Case 97-06, subject to the following conditions: <br /> I. Provision of the street name for the relocated 14th Street as Gateway Boulevard. <br /> I STATUS - (Condition Satisfied). The plans provide for the new street names, <br /> 2. No issuance of occupancy permits until such time that the relocated Round Lake Road is <br /> open for traffic and capable of accepting increased traffic. <br /> Ie STATUS - (Pending). The applicant's traffic engineer has reviewed this condition and is <br /> requesting a modification of this condition. The discussion on this modification can be found in <br /> the Update section of this memorandum item number one. <br /> I 3. Compliance with the approval of the Rice Creek Watershed District. <br /> STATUS - (pending). This condition is reviewed for compliance during construction. <br /> 4, Approval of and compliance with an NPDES permit by the MPCA. <br /> I STATUS - (pending). This condition is reviewed for compliance during construction. <br /> 5. Compliance with the City Engineer's letter dated June 24, 1997. <br /> I STATUS - (Pending). The grading plan has been modified in an attempt to minimize the <br /> exportation of material from the site. Therefore, the engineers letter is dated and he will be <br /> providing a revised letter at the meeting. <br /> I 6. The smallest amount of bare ground is exposed for as short a time as feasible. <br /> STATUS - (Pending). This condition is reviewed for compliance during construction, <br /> 7. Temporary ground cover, such as mulch, is used and permanent ground cover, such as <br /> I sod, is established. <br /> STATUS - (Pending). This condition is reviewed for compliance during construction. <br /> 8. Methods to prevent erosion and trap sediments are employed. <br /> I STATUS - (Pending), This condition is reviewed for compliance during construction, <br /> 9. Fill is stabilized to accepted engineering standards, approved by the City Engineer. <br /> STATUS - (pending). This condition is reviewed for compliance during construction. <br /> I 10. Approval of and compliance with wetland permits by the U.S. Army Corps of Engineers. <br /> STATUS - (Pending). This condition is reviewed for compliance during construction, <br /> ~ <br /> . <br /> - <br />