My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-27-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 10-27-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:03 PM
Creation date
11/10/2006 4:07:25 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I 5(/ <br />I <br />.,. . NORTH HEIGHTS LUTHERAN CHURCH <br /> PHASE ONE <br />I In 1986 North Heights Lutheran Church completed its first facility on its Arden Hills <br /> Campus comprising of approximately 67,000 square feet. The building materials <br />I consisted of brick and stucco exterior walls with a copper colored metal mansard-type <br /> roof. The primary use of this facility was to house a 1500 seat sanctuary, classrooms and <br /> an office area surrounding the sanctuary area. <br />I PHASE TWO <br />I In June, 1997 construction of the second phase began on the North Heights Lutheran <br /> Church, known as the Family Life Center. It comprises approximately 96,000 square feet, <br /> and the building materials consist primarily of brick with the exception of the southern <br />I end of the building known as the Activity Center. The walls of the Activity Center consist <br /> of architecturally designed precast concrete with reveals of brick that tie into the brick <br /> walls of the remaining Family Life Center. Portions of the roofbave copper colored <br />I metal to match the existing building identified as Phase One. <br /> PHASE THREE <br />Ie Although there is no timetable for construction of the sanctuary extension, preliminary <br /> sketches have been drafted of a floor plan and an elevation plan. Copies of those sketches <br />I are attached. The purpose for Phase Three is to extend the balcony portion of the <br /> sanctuary outward in a northeasterly direction. This new expansion will accommodate <br /> 2,500 additional seats. Below the balcony area, there will be administration and pastoral <br />I offices, an enlarged narthex area, and additional classrooms. At this time, the design <br /> includes exterior walls of matching brick with metal arched frames holding large panes of <br /> glass. The roof will consist ofa similar mansard type roofusing the same copper colored <br />I metal. <br /> Again, it is to be understood that no final plans for layout, design or use of materials have <br /> been decided upon. The present leadership, however, has no plans to consider building <br />I materials other that those specified in the abovementioned paragraph. <br />I <br />I <br />I <br />.. a:\nQrmheights\fundin!l\phasd <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.