Laserfiche WebLink
<br /> I <br /> I <br /> ~ <br /> 1 pve LOOP DETECTOR 6' x 6' EA 4 975.65 0.00 0.00 2.00 1.951.30 <br /> I , pve LOOP DETECTOR 6' x: 15' EA , 1,707.40 0.00 0.00 0.00 0.00 <br /> T SCHEDULE H.ij CIL\...'iGE ORDER NO. 1..TOTAL 0.00 1,951.30 <br /> I SClrFnTfTF.Hf) C.1-J.\'.-r.RORnFRNO 2..TOTAT <br /> 1 MOBILIZATION, CLE~IXG, & GRUBBING L< 1 1,200.00 1.00 0.00 1.00 L.200.00 <br /> , FtIRJ.'lISH & INSTALL TREE nEE 3 310.00 8.00 0.00 8.00 1,560.00 <br /> I ADDITIONAL PIPE WORK L< 1 3,664.00 l.00 3,664.00 1.00 3,664.00 <br /> 3 CONCRETE BLOCK RETAINING WALL SF 450 14.00 450.00 0.00 450.00 6,300.00 <br /> I T SCnEDl.JLE 25.0 CHA...'fGE ORDER NO. 2..TOTAL-TOTAL 3,664.00 13,724.00 <br /> TOTAL A.J.\roUNT TIllS PERIOD 6,335.77 <br /> I TOTAL ANlOUNT TO DATE 362.877.82 <br /> I SCHEDtiLE 1.0 oAK AVENUE..TOTAL 1,996.62 134,910.44 <br /> SCHEDULE 2.0 EIDE CIRCLEd TOTAL 157.25 47,494.90 <br /> Ie SCHEDULE 3.0 PASCAL AVENUE--TOTAL 0.00 31.298.22 <br /> SCHEDULE 4.0 McCRACKEN LANE -TOTAL 317.90 30,337.12 <br /> SCHEDULE 5.0 RIDGEVlOOD COURT--TOTAL 200.00 17,590.50 <br /> I SCHEDULE 6.0 Uu\1ETTI cmCLE SEAL COATnTOTAL 0_00 830.95 <br /> SCHEDULE 7.0 1.A..\1ETTI I.A..'fE SEAL COAT..TOTAL 0.00 1.826.00 <br /> SCHEDULE 8.0 FER.,......"WOOD ROAD SEAL COAT-.TOTAL 0.00 658.20 <br /> SCHEDULE 9.0 ~WOOD COURT SEAL COAT..TOTAL 0.00 583.30 <br /> I SCHEDULE 10.0 EDGEWATER AVENUE SEAL COAT..TOTAL 0.00 1,296.05 <br /> SCHEDULE 11.0 INDlAc'f OAKS cIRcLE sEAL COAT..TOTAL 0.00 226.30 <br /> SCHEDULE 12.0 INDlA..'{ OAKS COURT SEAL COATdTOTAL 0.00 1,391-30 <br /> I SCHEDULE 13.0 ROYAL lAL'lE SEAL COAT..TOTAL 0.00 2,131-60 <br /> SCHEDULE 14.0 WEST FLORAL DRIVE SEAL COAT--TOTAL 0.00 2,572.45 <br /> SCHEDULE 15.0 DAWN cmCLE SEAL COAT--TOTAL 0.00 800.95 <br /> SCHEDULE 16.0 CHA1HAM AVENUE SEAL COAT..TOTAL 0.00 10,391.10 <br /> I SCHEDULE 17.0 CHATHA...\1 cmCLE SEAL COATnTOTAL 0.00 660_95 <br /> SCHEDULE 13.0 CHATHA.\.f COURT SEAL COAT..TOTAL 0.00 890.10 <br /> SCHEDULE 19.0 BIKE TRAIL SEt\L COAT..TOTAL 0.00 2,391.15 <br /> I SCHEDULE 20.0 ARDEN OAKS DRIVEOVERlAY..TOTAL 0.00 31,626-45 <br /> SCHEDULE 21.0 .'\RI)fu'l" OAKS COURT OVERLAY..TOTAL 0.00 5,412-44 <br /> SCHEDlJLE 22.0 PINE 1REE DRIVE OVERlAY..TOTAL 0.00 16,276_53 <br /> SCHEDULE 23.0 McCRACKEN lANE OVERLAY ..TOTAL 0.00 5,599.52 <br /> I SCHEDULE 24.0 CHANGE ORDER NO. I--TOTAL 0.00 1951-30 <br /> SCHEDULE 25.0 CHANGE ORDER NO. ,..TOTAL..TOTAL 3,664.00 13,724.00 <br /> I <br /> ~ <br /> I n: \c Icrical\520\52Q068#4 PAGES 520.068-30 <br />