My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-15-1997
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1997
>
CCP 12-15-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:09 PM
Creation date
11/10/2006 4:07:54 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Original Quantity Amount <br /> Item Unit Contract Increase! Add! <br /> No. Item Unit Price Quantity (Decrease) (Deduct) <br /> EDULE 3.0 - SANITARY SEWER <br /> Manhole Extra Depth LF $80.00 162 7 $560.00 <br /> 14 Jack Bore 32" Steel Casing Pipe LS $190.00 50 (50) ($9,500.00) <br />I NET CHANGE ($8,940.00) <br />I Original Quantity Amount <br /> Item Unit Contract Increase! Add! <br />I No. Item Unit Price Quantity (Decrease) (Deduct) <br /> SCHEDULE 4.0 - W A TERMAIN <br />I 3 12" DIP Watennain LF $25.00 2,075 23 $575.00 <br /> 4 6" DIP Watennain LF $20.00 178 (90) ($1,800.00) <br />I 6 8" Gate Valve EA $500.00 I 2 $1,000.00 <br /> 7 12" Butterfly Valve EA $800.00 I 2 $1,600.00 <br />I 8 Fittings LBS $1.00 4,525 965 $965.00 <br /> 9 6" Service Connection with Valve EA $500.00 3 (3) ($1,500.00) <br />If Jack Bore 18" Steel Casing Pipe LF $120.00 50 (50) ($6,000.00) <br /> Pipe Foundation Material LF $2.00 2,075 23 $46.00 <br />I Add 14 8" DIP Watennain LF $23.00 0 187 $4,301.00 <br /> Add 15 2" Polystyrene Insulation SF $2.00 0 96 $192.00 <br />I Add 16 8" Service Connection with Valve EA $750.00 0 3 $2,250.00 <br /> Add 17 10" DIP Watennain LF $24.00 0 60 $1,440.00 <br />I Add 18 10" Gate Valve EA $7.00 0 I $700.00 <br /> NET CHANGE $3,769.00 <br />I <br /> Original Quantity Amount <br />I Item Unit Contract Increase! Add! <br /> No. Item Unit Price Quantity (Decrease) (Deduct) <br />I SCHEDULE 5,0 - SITEWORK <br /> 7 Remove 8" Watennain LF $10.00 290 10 $100.00 <br />I 8 Remove Curb & Gutter LF $2.00 300 150 $300.00 <br /> Add \l Reclaim Concrete Foundation CY $7.60 0 \l00 $8,360.00 <br />~ 12 Remove & Replace RR Track LS $23,402.00 0 1 $23,402.00 <br /> NET CHANGE $32,162.00 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.