My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 07-12-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 07-12-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:10 PM
Creation date
11/10/2006 4:08:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> -- ---~- <br /> . <br /> . -- -, <br /> . - - -..- - D';(.! <br />PROPOSAL FOR MODIFICATION OF EXISITING BUILDING <br />Le"al, R~~SJil'.tion: <br />SECTION 27 TOWN 30 RANGE 23 S ]35 FT OF N 1038 FT OF W 300 4/1 0 FT OF E IS OF <br />SE Y. OF SEC 27 TN 30 RN 23 <br />flat Name: <br />SECTION 27 TOW'N 30 RANGE 23 <br />Proiect N.'!me: <br />Alpine Insulation <br />Address: <br />3755 Dunlap Ave <br />Arden Hill, \fIN 55 Il2 <br />Owner: <br />Mark Murphy . <br />City Insulation of Madison <br />PO Box 38 <br />McFarland, WI 53558 <br />Alpine Insulation is an insulation instaJlation contractor. The warehouse area is approximately <br />10300 SF & is used for storing materials uscd for insulation. The yard area is not used for storing <br />matcrials. Wc arc proposing to add three] 6' wide x 14' high overhead doors & one 12' wide" <br />I 4' high overhead door in order to faeiliMe the loading & unloading of trucks that are sent out to <br />various job sites. The new overhead door materia! will match the existing overhead doors. <br />At the present time there is one overhead door on the south wall at the SF corner of the <br />warehouse & one overhead door centered on the west wall of the warehouse. The existing <br />contiguration limits accessibility to materials which results in excess standby timc for the work <br />crews while trucks are waiting to be loaded & unloaded. The limited access also increases the <br />amount of time it takes to [Dad a truck. <br />The new doors will allow malerials to be'staged inside the warehouse to for more ellieient <br />loading oflrueks in an orderly fashion, This will also allow multiple loading oftrucks & help to <br />eliminate truck congestion in the yard area. The installation of the new doors will not increase the <br />nmount of traffic at the warehouse. <br />Alpine Insulation has 15 office & field employees at this facility. There are ten parking spaces at <br />the south side of the olliee. Tbere is room for additional employee parking in the yard area. There <br />will not bc any increase ofthe impervious surtaces on the site. The yard area will not be used for <br />storage. <br />The new overhead doors are compatible with the llse & appearance of other buildings in the <br />immediate area. There are eight other buildings on Dunlap. Six of the buildings have overhead <br />doors on the north & south sides of the buildings ranging hom onc to eight overheard doors per . <br />side. <br />..'." ':~,:-:~2!:;~~C<--~' '..'",6. - . ~:/,:2 -299:2 C.,".f :~,~,~ . <br />
The URL can be used to link to this page
Your browser does not support the video tag.