My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 07-12-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 07-12-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:10 PM
Creation date
11/10/2006 4:08:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> , ~ <br /> . <br /> ~ EN HILLS <br /> MEMORANDllM <br /> DATE: July 3, 2006 <br /> TO: James l.ehnhotT. City PI3Illicr <br /> FROM: Kristine Giga, Civil Engineer ~ <br /> SUBJECT: Planning Case #06-013: Preliminary Plat (Revised) <br /> The following are comments hased upon a review of the revised plans dated 6/1 9/06: <br /> General <br /> . The developer will be required to obtain necessary penmts, including, but not limited to, NPDES, <br /> Ricc Creek Watershed District, and Ramsey County, <br /> 0 The existing utility easement over the lift station is large and in excess of what is needed for normal <br /> . maintenance of the lift station. The lift station is scheduled for reconstruction in the future, however, <br /> the area requested to he vacated will not be needed as pennanent easement. Both the Civil Engineer <br /> and Operations & rVlaintenance Supervisor SUPP0l1 the easement vacation, subject to a tClnporary <br /> eascmcnt as needed during the Iin station reconstruction, Please provide an exhibit of the easement to <br /> be vacated for elly approval. <br /> Sheet] <br /> 0 Label on-site benchmark on the title sheet (as on Sheet 3), <br /> Sheet 2 <br /> 0 Label on-site benchmark on the plan sheet (as on Sheet 3). <br /> 0 Add street names to the plan sheet. <br /> 0 Shift the water service closer to the driveway, The water service must be located outside ofthe <br /> remaining existing cascmcnI. <br /> 0 Shift the- sanItary sewer service to connect into the existing 8'- sewer main. The existing sanitary <br /> sewer main is depicted incOITectly on the plan set. See the attached as-built information and plan <br /> srlccl with proposed improvements to the Iifl station; adjust design accordingly_ <br /> 0 Provide service invert elevations at the \'lye. <br /> 0 Add a note stating that the street patch on New Brighton Road shall be reconstructed per Ramsey <br /> County requirements. <br /> Sheet 3 <br /> 0 Adjust the proposed contours on the llmth side of the retaining wall on Lot 1 to be no steeper than a <br /> 3: I slope, <br /> 0 Silt fence must be added along the construction limits by the lift station. <br /> . Sheet 4 <br /> 0 Identify location of gravel construction entrance on plan sheet. <br /> 'J\lClro- inCl. us';ndcnfl i tl~'PR&PW' Engi nccri ng200f).Planning (~as{'s'.o()-O 11_Thom _ DI;VI;" _2nd _ revie,;v .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.