My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 08-02-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 08-02-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:12 PM
Creation date
11/10/2006 4:09:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ~ . <br /> ~~HILLS <br /> MEMORANDUM <br />DATE: July 26, 2006 <br />TO: James Lehnhoff, City Planner <br />FROM: Dave Scherbe!, Building Official <br />SUBJECT: Arden Hills Office Park (1440 Highway 96) <br />Preliminarv Plan Review <br />I have the following comments regarding the Arden hills Office Park project. . <br />. The pedestrian way easement located towards the center of the property should be <br /> vacated and reestablish the pedestrian way as an easement at the far westem edge of the <br /> property were the trail is currently located. <br />. All of the buildings arc to be fully fire sprinklered to NFP A 13 <br />. Comments are for preliminary site plan review only. Full revIew once construction <br /> documents are received. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.