My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 09-06-2006
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2006
>
PCP 09-06-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:13 PM
Creation date
11/10/2006 4:10:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ~ <br />. ~HILLS <br /> MEMORANDUM <br /> DATE: August 30, 2006 PC Agenda Item 4.B <br /> TO: Planning Commission <br /> FROM: James Lehnhoff, City Planner <br /> SUBJECT: Boston Scientific Water Tower Sign age <br /> With the recent acquisition of Guidant by Boston Scientific, they are looking at replacing the Guidant <br /> signage with Boston Scientific signage. Based on a preliminary review of their wall and monument <br /> sign proposal, no special permits will be needed because the new signage will not exceed the sign <br /> area or dimensions of the old signage (a regular sign permit will still be required for each sign that is <br /> visible from the public right-of-way or neighboring properties). <br /> However, Boston Scientific is considering changing the dimensions and possibly the color of the <br /> signage on their water tower. In October 2001, the City approved a sign variancc for Guidant to put <br />. their company name/logo on the water tower at their campus (PC# 01-25). When Planning Case 01- <br /> 25 was approved for the water tower signage, the following two eonditions were included: <br /> 1. The color of the letters On the water tower being painted black, and the tower being non. <br /> illuminated. <br /> 2. The exterior appearance of the water tower being maintained. <br /> If the new signage for the water tower is deemed significantly different from the signage approved in <br /> PC# 01-25, a new site plan review for the signage maybe required. Staff is requesting the Planning <br /> Commission to review the Boston Scientific proposal and determine if a new site plan review is <br /> required or if the new signage is within the spirit of the previously approved sign variance. Should <br /> Boston Scientific decide to submit a sign proposal that does not exceed the area and dimensions of <br /> the existing water tower signage and meets the conditions of Planning Case 01.25, the Sign Code <br /> would only require a sign permit for a replacement ofthe sign copy. <br /> Boston Scientific will be bringing their water tower signage proposal to the meeting. <br /> Procedural Note: Deviations from the recently approved sign regnlations follow the site plan review <br /> process instead of the variance process, which was also the case in the previous sign regulations. <br /> Planning Case 01-25 was approved under an even older sign ordinance that required a variance to <br /> deviate from the sign standards. If dcemed necessary, the City would follow the site plan review <br /> process for significant changes to the water tower signage. <br /> City of Arden Hills <br />. Planning Commission Meetingfor September 6. 2006 <br /> \\M:etro-inet.us\ardenhills\Planning\Planning Commission\New-Old Business\2006\083006 - I30sScie water tower signage.doc <br /> Page 1 of! <br />
The URL can be used to link to this page
Your browser does not support the video tag.