My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-12-26-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2026
>
01-12-26-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2026 1:54:36 PM
Creation date
2/4/2026 1:51:09 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment F <br />0 <br />• <br />• <br />DATE: <br />TO: <br />FROM: <br />SUBJECT: <br />ENCLOSURES: <br />Overview <br />MEMORANDUM <br />October 21, 2003 <br />Agenda ltein &C <br />Mayor and Council <br />Michelle Wolfe, City Administrator <br />Aaron Parrish, Director of Community Development / Asst. City Admire. <br />C <br />Karth Lake Pumping Project Financing <br />1. Parcel Specific Estimate <br />Based on discussion at the October 21, 2003 Work Session, the following option for financing <br />the Karth Lake Pumping Project is being brought forth for Council consideration and approval: <br />Resident Cost <br />City Share Cost <br />City Total cost <br />Construction Contract Expense Only; Equal Percentage Distribution <br />t Year Average 3 Year Average 3 Year Range <br />$49.350 $358 $1,073 $465 to $1603 <br />$49,350 N/A NIA NIA <br />$67,636 <br />Key Assumptions and Figures <br />1. Project Cost Used: Construction Contract Only $98,700 <br />2. City Percentage Cost Allocation 50% <br />3. Improvement District Cost Allocation 50% <br />4_ Indirect expenses such as reduced interest eamings, ongoing maintenance of the district, and staff time are not included in the project cost <br />5. Direct expenses for design engineering, construction engineering, and legal expenses are not included in the total project cost <br />This option maintains the equal split between the City and Lake Improvement District, but only <br />takes into account the expense associated with the construction contract. A spreadsheet outlining <br />parcel specific impacts is attached for your review. The project is proposed to be funded out of <br />the surface water management fund. <br />Requested Action <br />Consider approval of the following: <br />a. That the $98,700 construction contract cost be split equally (50I50) between the City <br />and Lake Improvement District. <br />b. That taxes be levied against the Lake Improvement District for a period of three years <br />in an amount not to exceed $49,350 beginning with taxes payable in 2005. <br />c. That the City portion of the overall project cost be funded out of the surface water <br />management fund. <br />11EarthlFinancelCommuhity Services DirectorlStorm Water Utility110-21-03 Memo to Council RE Karlh lake Financing_doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.