Laserfiche WebLink
<br /> t.DG.18'2006 08:b8 #0761 p.003/003 <br /> PenlJit Al'pHcation No. 06-085 Moser Homes <br /> . 6, Cash surety jl) the amOutl.l of$500. <br /> Exhibits: 1. Permit Application cl2ted August 3,2006, n:ceJveO August 3, 2006, <br /> 2. Preliminary Grading, Drainage arid Erosion Control Plan prepared <br /> by Plowe Engineering; Inc.; dated August 3, 2006, received AUgl!sl <br /> 3,2006, <br /> Findings: L The proposed project entails construction ofa single family home O(J <br /> a lot riparian to Lake Johanrw, <br /> 2. Incorporation of infiltration practices is required to provide trea.tment <br /> of n!Doff from impervious aJ"cas prior tQ discharge to Lake Johanna. <br /> 3. District staff has field verifIed that there are no onsile wetlands, <br /> 4. TIle IOO-year flood elevation for Lake Jobann.a is 897.6. The <br /> proposed lowest floor is 907.3 thereby satisfying District freeboard <br /> requirements. <br /> 5. Th.e required set back from Lake Johanna is 50 feeL TIle proposed <br /> . building i.s approximately 15D,: feet from the OHW of Lake Johanna <br /> (878.0), thereby satisfying DNR setback requi.rements. <br /> 6. An acceptable erosion control plan ircluding silt fence downslope of <br /> disturbed areas and revegetation speelfications has been submitted, <br /> Board Action.: <br /> . <br /> Emmons & Olivi.er Resources, Inc. -2. 8/18/06 <br />