My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCP 06-01-2005
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2004-2009
>
PC Packets 2005
>
PCP 06-01-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:19 PM
Creation date
11/10/2006 4:17:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> , <br /> . <br /> . <br /> 98 <br /> Based on historical traffic counts on Highway 96 and Hamline Avenue, it was <br /> determined that traffic has been growing with a 3% straight-line annual growth <br /> rate in this area of Arden Hills, This annual growth rate was applied to the <br /> existing traffic volumes to develop 2007 no-build traffic volume forecasts, These <br /> are shown in Figures 5 and 6. <br /> The directional trip distributions for the town-office units are shown on Figure 7. <br /> The trip distributions are based on existing travel patterns in the area. The trips <br /> generated by the proposed development, as shown in Table 1, were distributed <br /> to the roadway system per the trip distributions shown in Figure 7. These <br /> forecasts were added to the 2007 no-build traffic volumes to develop 2007 build <br /> traffic volume forecasts, which are shown on Figures 8 and 9. <br /> e <br /> e <br /> _u,,_..___ <br /> .hden Hills Office Park 7 Arden Hill.'i, MN <br /> !i-(4/rc Impacr Stu{~)' .Huy 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.