Laserfiche WebLink
<br /> Business I Professional Office: 1 spaee for eaeh 250 sq. feet of gross floor area <br /> Assuming 76,000 square feet of office space the parking standards would call for 304 . <br /> parking spaces (applicant's plans state City requirement is 298.6). The applicant has <br /> proposed 306 parking spaees including 15 ADA spaces (8 ADA spaces would be <br /> required). <br /> As noted in the numher 4A of this report, the development does not appear to meet the <br /> landscape lot area requirement. One way to address the defieiency is to remove some of <br /> the impervious parking areas. Staff has identified three areas that could be removed <br /> which would allow the development to meet the landscape lot area requirement. <br /> However, turning these areas over to landscape lot area would eliminate 15 parking <br /> spaces. <br /> Minimum parking setbacks are five (5) feet from adjacent side and rear property lines and <br /> twenty (20) feet from the right-of-way line of any public street. The applicant's proposal <br /> contemplates parking setbacks of 18 feet from the east, 20 feet from the south (the access <br /> drive to Hamline gets as close as 5 feet from the south property line), and 16.1 feet to the <br /> Ramsey County right of way, The 3.9 foot parking sethack deficiency to the north should <br /> have little impact on any other property owners, In addition, there is approximately <br /> another 45 feet of boulevard between the applicant's north property line and the south <br /> curb line of Highway 96, <br /> lOA. Traffic, Access, and Circulation - Meets requirement . <br /> The City Engineer and the County Engineer have reviewed the applicant's plans and <br /> traffic study, The County Engineer has indicated that traffic generated by the <br /> development will not measurably impact existing traffic operations, The traffic study <br /> that was submitted indicates that development would generate and average of 868 daily <br /> trips with approximately 118 trips in during the peak A.M, hours and 15 trips out. <br /> During the peak P.M, hours, the traffic study indicates approximately 16 trips in and 98 <br /> trips out. <br /> At the April 19, 2005 neighborhood meeting for Planning Case #05-12, several residents <br /> raised concerns about the traffic to be generated by the development and in particular the <br /> impact at Hamline A venue and also at Keithson Drive. The traffic study shows that large <br /> majority of traffic on Hamline during the peak A.M. hours is headed southbound. The <br /> year 2007 build and no-build forecasts show a difference of 20 more trips southbound on <br /> Harnline and into the development and 40 more trips northbound and into the <br /> development. During the peak P.M, hours when traffic is headed northbound, the 2007 <br /> forecasts show 30 more left turns onto northbound Harnline to turn onto westbound <br /> Highway 96. This change should not impact the traffic on Hamline Avenue; it would be <br /> felt most by the traffic from the development. The alternative to this turning movement <br /> would be to exit from the Highway 96 access onto eastbound Highway 96 and make a U- <br /> \\Earth\Planning\Planning Cases\2005\05-12 Arden Hills Office Park - Royal Oaks Realty - PUD, Preliminary Plat for Old City Hall & PW Site . <br /> (PENDING)\06-01-04 PC Report Royal Oaks 05-12.doc <br /> Page 10 of 18 <br /> -- - --- <br />