My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-03 PTRC Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
1999-2009
>
2003
>
07-22-03 PTRC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:14:20 PM
Creation date
11/10/2006 4:28:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Arden Hills Parks, Trails and Recreation Committee Meeting Minutes 2 <br /> July 22,2003 <br />. . Page 4, General Discussion, last paragraph, should read as follows: "Committee <br /> Member Hendry asked if Arden Hills should undertake a project such as the <br /> Heritage Trail in Roseville. He stated he would like to see 20-30 areas within the <br /> City be highlighted to provide a sense of community". <br /> . Page 5, Adjournment, should read "Committee Member Thompson motioned, <br /> seconded by Committee Member Zilmer, to adjourn...". <br /> 3. HCM PARK SHEL TER DISCUSSION <br /> Matt Lysne, HCM Representative provided the Committee with an overview of the <br /> proposal: <br /> . Reviewed plans and location of the building. Noted that the proposal is for an L- <br /> shaped building adding that the design worked well for Tony Schmidt Park. He <br /> noted that the L-shape of the building would provide privacy for the picnic areas <br /> around the shelter in addition to providing a viewing area in the lower level. <br /> . Proposed moving the play area closer to the picnic shelter. <br /> . Confirmed that toilets and a kitchenette would be included in the plans. <br />~ . Would match the prairie style building located in Tony Schmidt Park. <br /> . Construction would begin in the spring with an expected completion by end ofthe <br /> summer season. Project would take approximately three to four months to <br /> complete. He explained that if they received the bid by the first or second week <br /> of February 2004 that it would put them in line for an early construction start. <br /> . Stated if approval process is completed by this fall that they would be able to <br /> utilize the winter months for development and refinement of the design. <br /> . Suggested reviewing each piece ofthe proj ect and separating the actual <br /> construction costs. <br /> Mr. Moore noted that the park has water and sanitary connection stating that from a <br /> mechanical point it would be very easy to connect. He reviewed the Lift Station 5 <br /> location noting that there is a need for trail hookups. He explained that as Staff builds the <br /> trail from the lower level, with steps to Perry Park, they would be able to connect the <br /> Chatham and Perry residents to the park. He stated that this connection would provide a <br /> safe access for the children. He stated that they would also have the opportunity to tie in <br /> trail connections with Tony Schmidt Park and other neighborhoods in addition to Perry <br /> Park. He stated that they want this project up next noting that Council is sold on this <br />~ project. He noted that this is the first major expenditure of park fund money and Council <br /> agrees that this is where the dollars should be spent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.