My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-16-25 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2025
>
12-16-25 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 4:57:52 PM
Creation date
3/10/2026 4:57:40 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br />o Final restoration at both parks in green space will need final approval in the <br />spring 2026 for warranty work and seed establishment. <br />o The City has requested the contractor add some extra draintile to the <br />scope at Freeway Park in some low spots to promote drainage. This work <br />has been completed and will be assessed in the spring of 2026. <br />• The 2027 Parks Project (Ingerson, Perry and Sampson): <br />o This may include a potential trail connection at the cul-de-sac of <br />Fernwood Ct to the bottom of hill at Ingerson Park, if budget allows <br />o Preliminary site conditions have been assessed and brought to PTRC at <br />the last monthly meeting in November. The items are being compiled by <br />Staff and will be brought to a Council Work Session in February or <br />March to get direction. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.