My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-26-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2026
>
03-09-26-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 8:42:58 AM
Creation date
3/16/2026 8:34:59 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Suggested proposed trail segments (yellow in images below). <br />Lexington Ave from County Rd D to Harriet Ave.: <br />• Option IA: Entire length = 3,900-feet; Estimated cost = $1,365,000 <br />• Option 1B: Edgewater Ave. to Tiller Ln. length = 1,400-feet; Estimated cost = $490,000 <br />• Option 1C: Edgewater Ave to Ingerson Rd. = 750-feet; Estimated cost = $262,500 <br />S <br />K <br />s <br />u <br />i <br />HARRIETAVE <br />v <br />A <br />y I <br /># ¢ <br />7 errr _��r.rT! <br />m <br />V <br />x 17LLER LN <br />CA RL TON DR <br />ti <br />a <br />a <br />INGERSON RD <br />W <br />tikz <br />EDGEWATER A6 <br />W Y <br />� J <br />Lae o <br />r <br />Josenhine W <br />-art�hsitair .GeogrCaphics and t �4 <br />i r <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.