My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-26-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2026
>
03-09-26-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 8:57:34 AM
Creation date
3/16/2026 8:44:15 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br /> <br />The AWIA emergency response plan process includes: <br /> <br />• Strategies and resources to improve the resilience of the system, including the physical <br />security and cybersecurity of the system; <br />• Plans and procedures that can be implemented, and identification of equipment that can <br />be utilized, in the event of a malevolent act or natural hazard that threatens the ability of <br />the community water system to deliver safe drinking water; <br />• Actions, procedures, and equipment which can obviate or significantly lessen the impact <br />of a malevolent act or natural hazard on the public health and the safety and supply of <br />drinking water provided to communities and individuals, and; <br />• Strategies that can be used to aid in the detection of malevolent acts or natural hazards <br />that threaten the security or resilience of the system. <br /> <br />Staff has negotiated a proposal with Bolton & Menk to prepare the required RRA and ERP for <br />submittal to the US EPA as provided in Attachments A & B. Bolton & Menk has key personnel <br />with background and experience to efficiently complete the assessment for Arden Hills. <br /> <br />Budget Impact <br /> <br />The total fee for the scope of work outlined in the proposal is $11,500. The 2026 operating <br />budget for the water utility fund has sufficient fund balance to cover the expense for preparing <br />the RRA and ERP. <br /> <br />Attachments <br /> <br />Attachment A – Risk & Resilience Assessment Proposal <br />Attachment B – Emergency Response Plan Proposal <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.