Laserfiche WebLink
<br />City of Arden Hills, MN – 25X.137753 MEASURING AND CONTROL INSTRUMENTS <br />January 2026 PAGE 26 90 01-2 <br />©2026 Design Tree Engineering, Inc All Rights Reserved <br />H. Manufacturer: <br />1. Anchor Scientific Eco-Float <br />2. Or Equal <br />PART 3 - EXECUTION <br /> COMMISSIONING <br />A. Contractor shall change relay connections, position limit switches, and make all other adjustments <br />required to obtain the proper operation of the equipment. <br />B. Contractor shall demonstrate to the Owner and the Engineer that all control systems operate as <br />specified. <br /> TESTING AND COMMISSIONING <br />A. Contractor shall check, test, calibrate, and put into operation all control systems specified herein and <br />shall demonstrate their operation to the Engineer. <br />B. All changes shall be recorded and all control schematic and wiring diagrams shall be revised and re- <br />issued with the changes. <br /> IDENTIFICATION <br />A. All devices shall be identified with a laminated plastic nameplate which has white lettering of not less <br />than 3/16 inch on a black background. Nameplates shall be attached with screws. <br /> <br />**** END OF SECTION ****